Laserfiche WebLink
URS <br /> • BRW, Inc. <br /> Jay Hartman <br /> January 17, 2001 <br /> Page 2 <br /> The Phase II investigation has several purposes: <br /> • Delineate the extent of the buried waste materials; <br /> • Characterize the nature of the waste materials; <br /> • Evaluate whether methane is being generated by the buried waste; <br /> • Characterize potential impacts to shallow ground water; and <br /> • Perform a preliminary risk assessment for the site. <br /> The following scope of services will be completed for the Phase II investigation. <br /> Task 1: MPCA Voluntary Investigation and Cleanup Programpplication Assistance <br /> BRW will complete and submit a MPCA Voluntary Investigation and Cleanup (VIC) Program Application for the <br /> City's use in enrolling in the VIC Program. The VIC Program provides technical assistance, expedited technical <br /> review and approval of investigations and response actions at properties with environmental impacts. This <br /> expedited review is an important factor for properties that are undergoing redevelopment. <br /> The VIC Program charges an hourly fee for their services. The MPCA fees are not included in this proposal. The <br /> City will be invoiced directly by the MPCA for their VIC Program services. <br /> • Task 2: Health and Safety Plan,Emission Control Plan and Contingency Plan Preparation <br /> A site-specific Health and Safety Plan (HSP), Emission Control Plan (ECP) and Site Contingency Plan will be <br /> prepared by BRW related to the Phase 11 investigation. The plans will be prepared in accordance with the VIC <br /> Program Guidance Document #10 entitled Site Safety and Contingency Plans. The ECP is required in the event <br /> that potentially asbestos-containing buried building materials are encountered during investigation activities. <br /> Draft plans will be submitted to the City for review and comment prior to submitting final versions to the MPCA. <br /> Task 3: Phase 11 Investigation Work Plan <br /> A Phase II Investigation Work Plan will be developed by BRW. The work plan will detail the activities proposed <br /> to meet the objectives of the Phase 11 investigation (Tasks 4 and 5). A draft work plan will be submitted to the <br /> City for review and comment prior to submitting the final version to the MPCA. <br /> Task 4: Subsurface Investigation Activities <br /> Geophysical Surveys <br /> BRW will conduct an electromagnetic survey (EM) and a magnetic survey to attempt to map the extent of the <br /> dump debris and to locate magnetic anomalies beneath the ground surface. The EM survey will be conducted <br /> using a Geonics EM-3 I* ground conductivity meter. The EM-31 can map subsurface features associated with <br /> changes in the ground conductivity, such as geological variations and groundwater contaminants. The magnetic <br /> survey will be performed with a Geometrics G-858 MagMapper' cesium magnetometer to pinpoint magnetic <br /> • anomalies within the fill material. These anomalies will be targeted for further investigation. <br />