My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 96-020 RESOLUTION APPROVING THE SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW) FINSING NO NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT (EIS)
StAnthony
>
City Council
>
City Council Resolutions
>
1996
>
CC RES 96-020 RESOLUTION APPROVING THE SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW) FINSING NO NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT (EIS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 2:49:08 PM
Creation date
4/19/2016 2:49:05 PM
Metadata
Fields
SP Box #
26
SP Folder Name
RES 1996
SP Name
CC RES 96-020 RESOLUTION APPROVING THE SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW) FINSING NO NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT (EIS)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESPONSE TO COMMENTS, FINDINGS OF FACT, AND RECORD OF DECISION <br /> SILVER LAKE CENTER COMMERCIAL REDEVELOPMENT <br /> ENVIRONMENTAL ASSESSMENT WORKSHEET(EAW) <br /> • Response: When MPCA requirements are monitoring ed, the three satisfied, g wells located behind the <br /> New Market building will be abandoned in accordance with all applicable local, state, and <br /> federal regulations. If circumstances require, the monitoring wells may be abandoned and <br /> relocated in order to accommodate building demolition and site redevelopment. As stated in the <br /> EA W, if any abandoned wells or septic fields associated with the abandoned farmstead are <br /> encountered during site redevelopment, these systems will be properly abandoned. <br /> 3. Please be aware that removal of friable asbestos-containing materials and materials that will <br /> become friable during removal must be performed by companies licensed by the MDH. In <br /> addition, the mandatory safe work practices must be used to do the removal. <br /> Response: As stated in the EA W, all asbestos materials will be removed from the buildings <br /> demolished during redevelopment excluding Category 1 non friable materials. The MPCA and <br /> U.S Environmental Protection Agency(EPA) will be notified prior to building demolition, all <br /> activities will be conducted by licensed contractors, and all applicable rules and regulations will <br /> be followed. <br /> Minnesota Pollution Control Agency, Paul Hoff, February 16, 1996 <br /> The MPCA stated"the information provided appears to properly identify the potential environmental <br /> effects of the project and appropriate mitigation. The MPCA does not recommend the preparation of <br /> an Environmental Impact Statement." The MPCA also noted that"Phase 1 grading . . . will require the <br /> • construction of temporary stormwater storage before construction is started." <br /> Response: So noted for the record. Temporary stormwater storage will be incorporated into the <br /> grading and erosion control plan and the project will comply with NPDES requirements. <br /> • <br /> PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.