My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 97-016 RESOLUTION CALLING A HEARING ON PROPOSED ASSESSMENT FOR 1997 STREET AND UTILIT IMPROVEMENTS
StAnthony
>
City Council
>
City Council Resolutions
>
1997
>
CC RES 97-016 RESOLUTION CALLING A HEARING ON PROPOSED ASSESSMENT FOR 1997 STREET AND UTILIT IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 2:45:12 PM
Creation date
4/19/2016 2:45:10 PM
Metadata
Fields
SP Box #
26
SP Folder Name
RES 1997
SP Name
CC RES 97-016 RESOLUTION CALLING A HEARING ON PROPOSED ASSESSMENT FOR 1997 STREET AND UTILIT IMPROVEMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01/08/97 14:50 '0612 935 8814 RCM ASSOCIATES [it 002/002 <br /> City of St.Anthony <br /> • 1997 Street and Watermain Improvements <br /> Revised Project Costs and Assessments <br /> RCM Project No.10366.02 <br /> Table 1 <br /> Dre-akdown of Constructioa Costs <br /> Total Construction Cost- $570,547,33 <br /> Total Street Construction Costs $383,973.63 <br /> Total Watermain Construction costs= $110,180.98 <br /> Total Storm Sewer Construction Costs $76,392.72 <br /> Table 2 <br /> Breakdown of Project Costs (including Engineering&Administration) <br /> Total Project Costs- $690,897.33 <br /> Total Street Project Costs= $464,968,18 <br /> Total Watermain Project Costs $1133,422.31 <br /> Total Storm Sewer Project Cost:_ $92,506.83 <br /> Table 3 <br /> • ,Breakdown of Street Costs <br /> Total Assessable Footage for all Streets-3,993.21 LF <br /> Total Street Project Cost(includes engineering,legal and admin.) $464,968.18 <br /> Assessable Amount(35%) $162,723.38 <br /> City Amount(65%) $302,244.80 <br /> Estimated Assessment Rate per Foot=$40.75 <br /> (including bonding costs,but doss not include water service connection assessment) <br /> Table 4 <br /> Breakdown of Watermain Costs <br /> Total Watermain Project Cost(vicludes engineering,legal and admin.) $133,422.31 <br /> Assessable Amount($400 per c(mnection,37 Connections) ($14,800.00) <br /> City Amount $118,622.31 <br /> Table 5 <br /> Breakdown of Total Estimated Project Costs <br /> Assessed Share(Streets and Wafer Connection) $177,523.38 <br /> City Share(Streets and Watermain) $420,867.12 <br /> Storm Sewer $92.506.83 <br /> Total Estimated Project Cost $690,897.33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.