CONTRACTOR Ryan Contracting,Inc. Brown&Cris,Inc. -Valley PavIng,Inc. S.R.Weldema Arcon Const.Co.,Inc.
<br /> ItemItem Descrl tion =Unit Unit PrlceF Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
<br /> 2021.501 Mobilization LS 1 $25,000.00 $25,000.00 $2,650-00 $2,650.00 $15,500.00 $15,500.00 $33,000.00 $33,000.00 $34,500.00 $34,500.00
<br /> 2104.501 Remove Conc.Curb 8 Gutter LF 5653 $2.00 $11,306.00 $2.25 $12,719.25 $2.25 $12,719.25 $1.56 $8,818.68 $2.00 $11,306,00
<br /> 2104.501 Remove Existing Storm Sewer Pi 08"Dia. LF 1612 $5.00 $8,060.00 $5.25 $8,463.00 $6.20 $9,994.40 $7.00 $11,284.00 $8.50 $13,702.00
<br /> 2104.503 Remove Concrete Pavement incl.DW SY 755 $6.50 $4,907.50 $8.00 $6,040.00 $5.45 $4,114.75 $7.90 $5,964.50 56.00 $4,530.00
<br /> 2104.505 Remove Bituminous Pavement incl.DW SY 9503 $1.50 $14,254.50 $1.57 $14_919 71 $0.89 $8,45T67. $1.40 $13,304.20 $1.071 $10,168,2 1
<br /> 2104 509 Remove Existing Curb Boxes EA 16 $35.00 $560.00 $10500 $1,680.00 $26.30 $420.80 $60.00 $960.00 $62.50 $1.000.00 `
<br /> 2104.509 Remove Existing Catchbasin EA 17 $275.00 $4,675.00 $280.00_ Sy760.00 $140,00 $2,38000 $175.00 $2,975.00 $156.25 $2,656.25
<br /> 2104.509 Remove ExistingManhole _ EA 7 $275.00 _ $1,925.00 $280.00 _ $1,960.00 $140.00 $980.00 $230.00 $1,610.00 $187.50 $1,312.50
<br /> 2104.511 Sawing Concrete Pavement LF 560 $400 $2,240.00 $3.50 $1,960.00 $4.85 $2,716.00 $3.70 $2,072.00 $4.75 $2,660.00 ;
<br /> 2104.513 Sawing Bituminous Pavement LF 535 $300 $1,605.00 - $2.00 $1,070.00 $2.30 $1,230.50 $2.10 $1,123.50 $3.50 $1,872.50
<br /> 2104.521 Salvage ExistinHydrant EA 3 -_$250.00 _$750.00 _ _$600.00 ..._$1800.00 $270.00 $810.00 $350.00 $1,050.00 $125.00 $375.00
<br /> 2104.521 Salvage Existing Copper Service LF 571 - $4.00 $2,284.00 $10.50 -'55,995.50 $1.65 $942.15 $2.35 $1,341.85 $2,50 $1,427.50
<br /> 2104.523 Salvage Existing GV and Box EA 3 $50.00 $150.00 $525.00 $1,575.00 $165.00 $495.00 $280.00 $840.00 $100.00 $300.00
<br /> 2104.523 Salvage Existin GV Box Only EA 6 $30.00 $180.00 $155.00 $930.00 $85.00 $510.00 $120.00 $720.00 $5000 $300.00
<br /> 2105.501 Common Excavation P CY 7828 $3.50 $27,398.00 $6.38 $49,942.64 $6.35 $49,707.80 $5.50 $43,054.00 $7.63 $59,727.64
<br /> 2105.525 Topsoil Borrow L CY 541 $7.00 $3,787.00 $8.00 _ $4,328.00 $9.45 $5.112.45 $9.45 $5,112.45 $8.00 $4,328.00
<br /> 2105.609 Geotextile Fabric TypeV _ SY 13810 $1.00 $13810.00 $0.90 512,429.00 $1.34 $18505.40 $1.40 $19334.00 $1.00 $13810.00
<br /> 2111.501 Test Rolling STA 29 $1_0.00 $290000_ $1500 $435.00 $65.00 $188500 $5.25 $152.25 $100.00 $2900.00
<br /> 2112.501 Su rade Preparation STA 29 $12500 $3,625.00 _ $110.00 _$3,190.00 $250.00 $7,250.00 $420.00 $12,180.00 $150.00 $4,350.00
<br /> 2211.501 Aggregate Base.Class 5, incl DW)_ TON 8820 $9.50 $83,790.00 $7.96 $70,207.20 $7.95 $70,119.00 $9.10 $80,262.00 $8.50 $74,970.00
<br /> m 2 2211.501 Aggregate Base,Class 5 100%Crushed Quarry Rock TON 3790 $9.20 $34,868.00 $8.45 $32,025.50 $8.45 $32,025.50 $9.35 $35,436.50 $8.65 $32,783,50
<br /> X rp
<br /> 2301.501 8"Concrete Pavement(High Early Strength SY 150 $38.00 $5,700.00____$40.00 -$6,000.00 $36.75 _$5,512.50 $36.75 $5,512.50 $39.00 45,850.00
<br /> Q
<br /> a 2331.508 1 172"Type 4 1 A Bituminous Wear TON 785 $31.35 $24,609.75 $27.87 $21,877.95 $27.00 $21,195.00 $24.90 $19,546.50 $26.60 $20,881.00
<br /> D 2331.514 2"Type 31B Bituminous Base TON 1050 $27.25 $28,612.50 $25.08 $26,334.00 $24.35 $25,567.50 $21.40 $22,470.00 $24.60 $25.830.00
<br /> Cl) 0 2357.502 Bituminous Tack Material GAL 466 $1.75 $815.50 $1.54 •5717.64 $1.80 $838.80 $2.10 $978.60 $1.55 $722.30
<br /> C
<br /> m 2502.521 6"PE Perforated Pipe Drain Tile LF 5069 $10,00 $50,690,00 $8.85 $44,860.65 $5.30 $26,865.70 $4.40 $22,303.60 $6.13 $31,072.97
<br /> 4
<br /> w y 2502.601 Connect Drain Tile to Catch Basin EA 14 $100.00 $1,400.00 $105.00 $1,47000 $150.00 $2,100.00 $230.001 $3,220.00 $62.50 $875.00
<br /> o m 2503.511 12"RCP,CL V LF 167 $24.00 $4 008 00 $3005 $5 018,35 $24.40 $4,074.80 $31,101 $5,19370 $27.99 $4,67433
<br /> 2503 511 15"RCP,CL V LF 829 $25.00 $20.725,00 $32.15 _S26 652.35 $27.65 $22,921.85 $31.15 $25,823.35 $25.74 $21,338.46
<br /> � 2503.511 18"RCP,CL V LF__496 $26_00__$12,948.00 $34.05 _$_16,956.90 $31,15 $15,811.50 $31.60 $15,73680 $28.10 $13,993.80
<br /> Z 2504.602 Connect to Existing Watermain _ EA 5 $1_45000 $7,250.00 $788.00 _ 53,940.00 $1,090.00 $5,450.00 $1,150.00 $5,75000 $412.50 $2,062.50
<br /> 504.602 Hydrant EA 4 $1,19000 $4,760.00 $1,268,00 $5,072.00 $1,530.00 $6,120.00 $1740.00 $6,96000 $1,362.50 $5,450.00
<br /> 504.602 Adjust GV Box EA 9 $145.00 $1,305.00 $156.00 _$1,404.00 $165.00 $1,485.00 $130.00 $1,170.00 $150.00 $1,350.00
<br /> 504.602 Curb Stop,Box and Cap EA 16 $210.00 $3,360.00 _-$72.00 $1,152.00 $12400 $1,984.00 $55.00 $880.00 $110.00 $1,760.00
<br /> 0 504 602 Flared End Coupling--- _ __ _..EA _-.-16 _ $50.00 _-$800`00 __ _ $3000 _ $480.00 $4_4.20 $707.20 $70.00 $1.120.00 $16.25 $260.00
<br /> 504.602 Reconnect Existing Service to New Main include Corporation EA 21 $175.00 $3,675.00 $368.00 $7,728.00 $38000. $7,980.00 $390.00 $8,190.00 $44.25 $929.25
<br /> 504.602 6"GV and Box EA 5 $400.00 $2,000.00 $575.00 $2,875.00 $420.001 $2,100.00 $390.00 $1,950-001 $621.00 $3,105.00
<br /> 504.602 8"GV and Box EA 5 $510.00 $2,550,00_ $715.00 _ $3,575.00 $575.00 $2.875.00 $540.01 $2,700.00 _ $794.00 $3 970.00
<br /> 504.602 10"GV 8 Box EA 3 $660.00 $1,980.00 $935.00 $2,805.00 $885.00 $2,655.00 $800.00 $2,40000 $1,07900 $3,237.00
<br /> 504 602 Ductile Iron Fittings --_- LB 1304 $1.00 $1,304.00 - $3.00 $3,912.00 $8.70 $11,344.80 $2.50 $3,26000 54.60 S5 998.40
<br /> •` 506.602 Connect Ex.Pipe to MH EA 5 $350.00 $1,75_0.00 $460.00 $2,300.00 $460.00 $2,300.00 $260.00 $1,300.00 $406.25 $2,031.25
<br /> �\u\ 504.603 Remove 8 Reinstall Sprinkler System LF 100 $10001 $1,000.00 $25.00 $2,500.00 $18.50 $1,850001 $7.90 $790.00 $4.75 $475.00
<br /> 504.603 1"Copper Service Pipe LF 1 688 $19.001 $13,072.00_ 512.90 $8,875.20 1 $15.65 $10,767.20 $19.551 $13,450 40 $17.00 511,696.00
<br /> Page 3 of 4
<br />
|