My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 97-022 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO SIGN A CONSTRUCTION COOPERATIVE AGREEMENT WITH HENNEPIN COUNTY
StAnthony
>
City Council
>
City Council Resolutions
>
1997
>
CC RES 97-022 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO SIGN A CONSTRUCTION COOPERATIVE AGREEMENT WITH HENNEPIN COUNTY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 2:45:34 PM
Creation date
4/19/2016 2:45:30 PM
Metadata
Fields
SP Box #
26
SP Folder Name
RES 1997
SP Name
CC RES 97-022 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO SIGN A CONSTRUCTION COOPERATIVE AGREEMENT WITH HENNEPIN COUNTY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• City of St. Anthony <br /> Estimated Cost of Improvements <br /> Stinson Boulevard at 35th Avenue N.E. <br /> PRELIMINARY COST PARTICIPATION SUMMARY <br /> Item Item Description Unit Quantity Unit Price Amount <br /> 2104.501 Remove Conc. Curb &Gutter LF 53 $1.50 $79.50 <br /> 2104.501 Remove Existing Storm Sewer Pipe, <18" Dia. LF 70 $5.25 $367.50 <br /> 2104.503 Remove Concrete Pavement incl. DW SY 35 $8.00 $280.00 <br /> 2104.505 Remove Bituminous Pavement incl. DW SY 100 $1.35 $135.00 <br /> 2104.509 Remove Existing Catchbasin EA 2 $425.00 $850.00 <br /> 2104.509 Remove Existing Manhole EA 1 $450.00 $450.00 <br /> 2104.511 Sawing Concrete Pavement LF 80 $6.501 $520.00 <br /> 2105.609 Geotextile Fabric Type V SY 100 $1.05 $105.00 <br /> 2211.501 Aggregate Base, Class 5 100% Crushed Quarry Rock TON 100 $8.60 $860.00 <br /> 2301.501 8" Concrete Pavement(High Early Strength) SY 35 $36.40 $1,274.00 <br /> 2331.508 1 1/2"Type 41A Bituminous Wear TON 8.5 $24.65 $209.53 <br /> •j 2331.514 2"Type 31 B Bituminous Base TON 11.5 $21.22 $244.03 <br /> j 2503.511 12" RCP, CL V LF 70 $19.51 $1,365.70 <br /> 506.602 Connect Ex. Pipe to MH EA 2 $350.001 $700.00 <br /> 2506.509 Catchbasins 4' Diameter) EA I 1 $925.93 $925.93 <br /> j 2506.509 Catchbasins (2'x 3' Box EA 1 $875.00 $875.00 <br /> 2506.509 Manholes (4' Diameter) EA 1 $974.93 $974.93 <br /> 2531.501 IB618 Concrete Curb and Gutter LF 53 $6.34 $336.02 <br /> 2575.505 ISod Type - Lawn SY 12 $1.51 j $18.12 <br /> Totals $10,570.26 <br /> TOTAL COST OF CONSTRUCTION $10,570.26 <br /> HENNEPIN COUNTY'S PROPORTIONATE SHARE (50%) $ 5,285.13 <br /> • <br /> Hennepin County Agreement No. PW 07-10.97 <br /> Exhibit"B"; Sheet 1 of 1 �c� <br />
The URL can be used to link to this page
Your browser does not support the video tag.