My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 98-030 RESOLUTION APPROVING WSB & ASSOCIATES, INC. TO PERFORM SUMP PUMP INSPECTIONS SERVICES
StAnthony
>
City Council
>
City Council Resolutions
>
1998
>
CC RES 98-030 RESOLUTION APPROVING WSB & ASSOCIATES, INC. TO PERFORM SUMP PUMP INSPECTIONS SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 2:41:30 PM
Creation date
4/19/2016 2:41:28 PM
Metadata
Fields
SP Box #
26
SP Folder Name
RES 1998
SP Name
CC RES 98-030 RESOLUTION APPROVING WSB & ASSOCIATES, INC. TO PERFORM SUMP PUMP INSPECTIONS SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the easiest to identify and remove from the sanitary sewer system. In many cases, removal can be <br /> completed by the property owner for minimal cost using readily available materials and tools with <br /> • minor instruction and guidance. We would recommend that the City of St. Anthony consider a <br /> program that has been used successfully in several area communities to identify and remove sump <br /> pump connections to reduce 1/I in the sanitary sewer system. <br /> Approach <br /> The recommended program includes several steps as follows: <br /> 1. Adopting an ordinance requiring inspection and establishing a surcharge for non-compliance. <br /> 2. Preparing a public information program to inform residents of the new ordinance <br /> requirements and the need to reduce the I/I including: <br /> a. Articles in the City Newsletter regarding sump pumps and 1/1. <br /> b. Small inserts for mailing with water bills or newsletter articles. <br /> C. Preparation of an information video for release on the cable television system. <br /> d. A separate directed mailing inviting residents to a public information meeting. <br /> • e. Distribution of recommendations for re-routing sump pump discharge lines. <br /> 3. Inspection of each sanitary sewer connection in the City. This could be done in groups of <br /> about 575 to control the overall operation of the program. The inspection would include: <br /> a. Entering every building connected to the sanitary sewer and observing the plumbing <br /> piping to determine the presence or lack of a sump pump. <br /> b. Completing a three-part inspection form which will establish, at the time of the <br /> inspection, whether or not the connection is in compliance with the new ordinance. <br /> Homeowners will sign and date the form and keep a copy for their records. <br /> C. If the connection does not comply with the ordinance, the inspector will provide a <br /> sketch of a recommended connection method and list of plumbers that do work in the <br /> city. <br /> d. If a connection fails, it will be reinspected in 30 days to verify that the corrections <br /> have been made, or if corrections have not been made, to initiate the surcharge <br /> provisions of the ordinance. <br /> e. If the building has a sump basket but no pump,a sticker will be placed on the basket <br /> • cover notifying future users of the inspection requirement prior to installation of the <br /> sump pump. <br /> Page 2 F IWPW/MPROPOSAL1059.97lpropow! <br />
The URL can be used to link to this page
Your browser does not support the video tag.