Laserfiche WebLink
• February 18, 1998 <br /> Mr. Mike Morrison <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony,MN 55418-1699 <br /> Re: Proposal for Engineering Services <br /> Recoating of Elevated Water Storage Tank <br /> St. Anthony,MN <br /> RCM File No. 10456.00 <br /> Dear Mr. Morrison: <br /> Rieke Carroll Muller Associates, Inc. (RCM) appreciates the opportunity to provide the City <br /> of St.Anthony with this proposal to prepare an engineering report which will identify the scope <br /> of work needed to rehabilitate and recoat the City's elevated water storage tank. Preparation of <br /> the report will include collection,review and analysis of available information as well as a site <br /> survey of the present coating system and structure to determine their condition. The site survey <br /> Ic I]] will be a visual inspection both inside and outside the tank and samples of the existing coating <br /> system will be collected so that we can identify the proper preparation work and develop the <br /> carrdata necessary for specifying a compatible coating system. The report will also include <br /> Carroll �' p �g p g Y p <br /> muller estimated construction costs for the project,including welding and miscellaneous repairs. <br /> wociates, inc. <br /> gineers <br /> architects Once the report has been completed by RCM and approved by the City,project specifications <br /> land surveyors can be prepared to encompass the repairs and recoating details identified in the report. <br /> equal opportunity <br /> employer RCM proposes to provide this report to the City of St. Anthony for a lump sum fee of$4,800, <br /> including expenses. <br /> RCM understands that the City intends to have its new logo painted on the tower. Recognizing <br /> that the new logo is a different color from the old one,it may be necessary to change the base <br /> color of the tower to more closely complement the color of the new logo. RCM recommends that <br /> the City select a color combination and logo placement scheme to be used with the tower <br /> recoating. To assist the City with its selection process,we can provide a representative color <br /> palette and a schematic representation of the tower with the new logo. <br /> years Please call us if you have questions. <br /> helpingof <br /> build Sincerely, <br /> communities <br /> RIEKE CARROLL MULL ASSOCIATES,INC. <br /> l <br /> L/ <br /> chard C. Potz Har(y Koutsoumbos,P.E. <br /> innetonka, <br /> 01 red circle dr. Project Manager Vice President <br /> t office box 130 <br /> mn <br /> 55343-0130 <br /> (612)935-6901 ma L. laassen,P.E. <br /> fax(612)935-8814 President/CEO <br /> www.rcm-assoc.com <br />