My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 98-043 RESOLUTION RECEIVING AN ENGINEERING REPORT AND AUTHORIZING FOR BIDS RELATING TO REHABILITATION AND RECOATING OF AN ELEVATED WATER STORAGE TANK
StAnthony
>
City Council
>
City Council Resolutions
>
1998
>
CC RES 98-043 RESOLUTION RECEIVING AN ENGINEERING REPORT AND AUTHORIZING FOR BIDS RELATING TO REHABILITATION AND RECOATING OF AN ELEVATED WATER STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 2:42:18 PM
Creation date
4/19/2016 2:42:17 PM
Metadata
Fields
SP Box #
26
SP Folder Name
RES 1998
SP Name
CC RES 98-043 RESOLUTION RECEIVING AN ENGINEERING REPORT AND AUTHORIZING FOR BIDS RELATING TO REHABILITATION AND RECOATING OF AN ELEVATED WATER STORAGE TANK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• February 18, 1998 <br /> Mr. Mike Morrison <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony,MN 55418-1699 <br /> Re: Proposal for Engineering Services <br /> Recoating of Elevated Water Storage Tank <br /> St. Anthony,MN <br /> RCM File No. 10456.00 <br /> Dear Mr. Morrison: <br /> Rieke Carroll Muller Associates, Inc. (RCM) appreciates the opportunity to provide the City <br /> of St.Anthony with this proposal to prepare an engineering report which will identify the scope <br /> of work needed to rehabilitate and recoat the City's elevated water storage tank. Preparation of <br /> the report will include collection,review and analysis of available information as well as a site <br /> survey of the present coating system and structure to determine their condition. The site survey <br /> Ic I]] will be a visual inspection both inside and outside the tank and samples of the existing coating <br /> system will be collected so that we can identify the proper preparation work and develop the <br /> carrdata necessary for specifying a compatible coating system. The report will also include <br /> Carroll �' p �g p g Y p <br /> muller estimated construction costs for the project,including welding and miscellaneous repairs. <br /> wociates, inc. <br /> gineers <br /> architects Once the report has been completed by RCM and approved by the City,project specifications <br /> land surveyors can be prepared to encompass the repairs and recoating details identified in the report. <br /> equal opportunity <br /> employer RCM proposes to provide this report to the City of St. Anthony for a lump sum fee of$4,800, <br /> including expenses. <br /> RCM understands that the City intends to have its new logo painted on the tower. Recognizing <br /> that the new logo is a different color from the old one,it may be necessary to change the base <br /> color of the tower to more closely complement the color of the new logo. RCM recommends that <br /> the City select a color combination and logo placement scheme to be used with the tower <br /> recoating. To assist the City with its selection process,we can provide a representative color <br /> palette and a schematic representation of the tower with the new logo. <br /> years Please call us if you have questions. <br /> helpingof <br /> build Sincerely, <br /> communities <br /> RIEKE CARROLL MULL ASSOCIATES,INC. <br /> l <br /> L/ <br /> chard C. Potz Har(y Koutsoumbos,P.E. <br /> innetonka, <br /> 01 red circle dr. Project Manager Vice President <br /> t office box 130 <br /> mn <br /> 55343-0130 <br /> (612)935-6901 ma L. laassen,P.E. <br /> fax(612)935-8814 President/CEO <br /> www.rcm-assoc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.