Laserfiche WebLink
Exhibit A <br /> aThe Grantee is responsible for flood proofing of residences,acquisition of flood prone structures and the creation of storm water retention areas <br /> nveyance systems in accordance with the"Engineering Analysis of Selected Flood Problem Areas within the City of St.Anthony"dated December <br /> 31, 1997. This analysis includes all of the work plans,maps and costs associated with construction improvements within the City. Two(2)copies of <br /> completed plans and specifications must be submitted to the state. <br /> c.myfiles.stanthny.con.wpd May 12,1998 5 <br />