Laserfiche WebLink
• EXHIBIT D -- CERTIFICATION REQUIREMENTS <br /> CLEAR WATER DISCONNECTION'S <br /> The first, second and fourth year certification shall be based on findings resulting from an <br /> inspection of at least 20% of all non-compliance connections identified during the initial <br /> inspections. <br /> On the third anniversary date, along with said certification, Lendee shall also provide the Council <br /> with physical documentation in the form of visual inspection records supporting the certification <br /> of 20% of all non-compliance connections identified during the initial inspections, and those <br /> connections that were found during the first and second year certifications to be reconnected to <br /> the system after the original disconnection. <br /> On the fifth anniversary date along with said certification, Lendee shall also provide the Council <br /> with physical documentation in the form of visual inspection records supporting the certification <br /> of 20%of all non-compliance connections identified during the initial inspections, those <br /> connections that were found during the third and fourth year certifications to be reconnected to <br /> the system after the original disconnection, and an additional number of re-inspections to be <br /> chosen by the Council. The additional properties that the Council selects to be re-inspected will be <br /> • from those identified in the "Final Project Summary Report," according to paragraph 5.02, as <br /> being non-compliant prior to the project. The total number of additional inspections as chosen by <br /> the Council shall not exceed 10%of the total number of non-compliance connections as <br /> discovered during the original inspection. <br /> Each years certification inspections shall represent different connections from those inspected <br /> during other years so that at the end of the five year certification period every non-compliance <br /> connection shall be inspected at least once. <br /> Thirty days prior to the community performing the certification inspections during the third and <br /> fifth year,the Lendee will notify the Council in writing so that a representative from the Council <br /> has the opportunity to be present during the inspections. All properties to be inspected for <br /> certification shall be identified prior to the inspections and a list of said properties along with a <br /> map showing their locations shall be sent to the General Manager of Wastewater Services <br /> Department for review and comment. Certification inspections shall be performed during periods <br /> when UI sources would typically be discharged into the system. The inspections shall consist of <br /> visual observations of the sump pump discharge points located outside the building limits. In the <br /> absence of evidence that shows sump discharges outside the building, a visual inspection of the <br /> sump pump plumbing inside the building will be required. <br /> In the event that any property is found to be reconnected to the sanitary system during the <br /> certification inspections, that property shall be disconnected from the system. <br />