My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 99-021 A RESOLUTION AUTHORIZING WSB & ASSOCIATES, INC. TO PREPARE A FEASIBILITY STUDY RELATING TO SILVER POINT PARK
StAnthony
>
City Council
>
City Council Resolutions
>
1999
>
CC RES 99-021 A RESOLUTION AUTHORIZING WSB & ASSOCIATES, INC. TO PREPARE A FEASIBILITY STUDY RELATING TO SILVER POINT PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:18:55 PM
Creation date
4/19/2016 4:18:53 PM
Metadata
Fields
SP Box #
31
SP Folder Name
RES 1999
SP Name
CC RES 99-021 A RESOLUTION AUTHORIZING WSB & ASSOCIATES, INC. TO PREPARE A FEASIBILITY STUDY RELATING TO SILVER POINT PARK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- B.A.Mittelsceadt,P.E. <br /> 350 Westwood Lake Office Bret A.Weiss,P.E. <br /> IIGy�B 8441 Wayzata Boulevard Peter R.Willenbring,P.E. <br /> Minneapolis, MN 55426 Donald W Sterna,P.E. <br /> Ronald B.Bray,P.E. <br /> • 612-541-4800 <br /> &Associates, Inc. FAX 541-1700 <br /> Memorandum <br /> To: Honorable Mayor, City Council and Staff <br /> City of St.Anthony <br /> From: Todd E. Hubmer,P.E. <br /> Peter R. Willen bring,P.E. <br /> Date: February 2, 1999 <br /> Re: Response to Questions Relating to Silver Point Park <br /> WSB Project No. 1065.40 <br /> We have prepared the following answers to the questions you requested in your memo from <br /> January 27, 1999. <br /> 1. What is the difference in price of the pipes for Wilson -36"versus a 72"? <br /> • Preliminarily,it is anticipated that the cost to construct the 72-inch system from 29''Avenue <br /> to 27' Avenue would be at a minimum of$700,000 over the cost for the existing storm <br /> sewer system in Wilson Street. Furthermore,this system would not be in alignment with the <br /> downstream storm sewer at 27h Avenue,and conflicts with other utilities will be a significant <br /> issue. <br /> 2. What is the capacity of the Silver Point Park expansion possibilities? <br /> Attached,please find a figure showing three possible options for expanding Silver Point Park <br /> improvements, as previously discussed. These options are as follows: <br /> • Option No. 1: Acquire four homes and easements for three properties immediately <br /> south of Silver Point Park. This option would provide an additional 2.44 acres of <br /> land for storm water storage. This option would add 15 acre-feet to the 24 acre-feet <br /> of storm water storage now proposed with Silver Point Park. <br /> • Option No. 2: Acquires six homes and easements over three backyard areas <br /> immediately south of Silver Point Park. In addition,Trillium Park could be utilized <br /> and reconfigured along with the frontage road to provide storm water storage. This <br /> option provides an additional 5.34 acres of land for storm water storage. This option <br /> • could provide approximately an additional 27 acre-feet of storm water storage. <br /> M i n n e a p o l i s • S t . C l o u d FAWPWIMI065.40\020299-hme.wpd <br /> Infrastructure Engineers Planners <br /> EQUAL OPPORTUNITY EMPLOYER <br />
The URL can be used to link to this page
Your browser does not support the video tag.