My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 99-049 A RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO SIGN A PROFESSIONAL SERVICES AGREEMENT
StAnthony
>
City Council
>
City Council Resolutions
>
1999
>
CC RES 99-049 A RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO SIGN A PROFESSIONAL SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:20:44 PM
Creation date
4/19/2016 4:20:41 PM
Metadata
Fields
SP Box #
31
SP Folder Name
RES 1999
SP Name
CC RES 99-049 A RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO SIGN A PROFESSIONAL SERVICES AGREEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B <br /> • WSB & ASSOCIATES, INC. <br /> DEFINITIONS <br /> B.1 "HOURLY BASIS" means that the fee shall be determined by multiplying the number of <br /> hours of work performed, times the personnel cost for the appropriate labor classification <br /> shown on the fee schedule. <br /> B.2 "CONSTRUCTION COST" means the amount of the construction contract awarded for the <br /> improvement project,plus the value of any equipment,materials or supplies furnished by the <br /> City for installation or use by the construction contractor, plus or minus any increases or <br /> decreases in the contract amount implemented by change order, supplemental agreement or <br /> other instrument subsequent to award of the contract. Reductions in the contract amount <br /> subsequent to award will not be a basis for reducing the fee unless it can be demonstrated <br /> that as a result of this reduction in the contract amount, the work effort associated with <br /> completing this project is reduced. If a construction contract is not awarded,the construction <br /> cost shall be considered to be the engineer's estimated cost for the construction of the <br /> improvement project,as prepared for the bid opening,unless the City believes the engineer's <br /> estimate is unreasonable, in which case, the Engineer and the City shall agree upon an <br /> alternate basis for determining the construction cost. Such alternate basis may include <br /> negotiation, development of an independent estimate by a third party, or other means. <br /> • B.3 "EXPENSES" means out-of-pocket costs incurred in the performance of the services <br /> described herein or authorized by the City which are not direct personnel costs or overhead <br /> costs. Expenses include long distance telephone charges, subconsultant fees, testing costs, <br /> outside reproduction and printing costs, equipment rental costs and similar costs. <br /> BA "LUMP SUM PRICE" means an amount negotiated between the City and Engineer for <br /> performance of the services specified in the Design Agreement which is subject to <br /> adjustment only if the Scope of Services changes or if circumstances beyond the control of <br /> the Engineer causes an increase in the cost of performance of the services. <br /> B.5 "DESIGN AGREEMENT"means a written order executed by an authorized representative <br /> of the City describing the scope of services and engineering fee arrangement for an <br /> improvement project. <br /> B.6 "IMPROVEMENT PROJECT" means public improvement projects authorized by the City <br /> and paid for with public funds. <br /> B.7 "DEDICATION PROJECT"means those proposed improvement projects to be constructed <br /> by private funding for eventual dedication to the public. <br /> B.8 "INSTRUMENTS OF SERVICE"any plan,specification,or report prepared by the Engineer. <br /> • <br /> Exhibit Page I of 1 F:wvrWTN\CLUNT\ctwh-bwpa <br />
The URL can be used to link to this page
Your browser does not support the video tag.