My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 99-066 A RESOLUTION APPROVING PLANS FOR THE SILVER LAKE ROAD BRIDGE RECONSTRUCTION PROJECT
StAnthony
>
City Council
>
City Council Resolutions
>
1999
>
CC RES 99-066 A RESOLUTION APPROVING PLANS FOR THE SILVER LAKE ROAD BRIDGE RECONSTRUCTION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:21:45 PM
Creation date
4/19/2016 4:21:41 PM
Metadata
Fields
SP Box #
31
SP Folder Name
RES 1999
SP Name
CC RES 99-066 A RESOLUTION APPROVING PLANS FOR THE SILVER LAKE ROAD BRIDGE RECONSTRUCTION PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• 2. Upon award of a construction contract by MN/DOT the County shall perform or <br /> contract the performance of the construction inspection. <br /> 3. The County shall acquire and pay for all rights of way and easements required for the <br /> construction of the project within the grading limits of the plan. Any rights of way that cannot be <br /> negotiated will be acquired through eminent domain proceedings. <br /> 4. All City owned rights of way and easements within the limits of the project for roads, <br /> utilities and stormwater are hereby granted to the County for project use during construction. <br /> 5. All Silver Lake Road rights of way and temporary easements will be in the name of the <br /> County, and parking and other regulations will be controlled by the County. <br /> 6. The County and City shall participate in the costs of construction in accordance with <br /> the adopted Ramsey County Public Works cost participation policy. <br /> 7. The estimated construction cost of items eligible for federal participation is <br /> $824,393.50. Federal Funds granted to this project shall be applied to all eligible items at a rate not <br /> to exceed 80% of their construction cost. <br /> 8. The estimated construction cost of items not eligible for federal participation is <br /> $1,142,317.20. The costs will be paid by a combination of County State Aid Highway funds, <br /> • Municipal State Aid Highway funds and City of Saint Anthony local funds. <br /> 9. Storm sewer construction costs attributable to the road right of way and facilities <br /> needed for the road drainage are estimated to be eligible for reimbursement from County State Aid <br /> funds. Each agency shall pay for the storm sewer costs as determined by the MN/DOT hydraulics <br /> memorandum. <br /> 10. Upon completion of the project, the County shall own and maintain the storm sewer <br /> catch basins and leads on its County roads and the City shall own and maintain the storm sewer <br /> trunk lines within the City. Laterals and drains servicing property within the City outside the road <br /> right of way shall also be owned and maintained by the City. <br /> 11. The City shall pay to the County 50% of the cost of modifications to the median <br /> constructed within the City. This consists of replacing the existing bituminous median with <br /> colored, stamped concrete. Upon completion of the project, the County shall own and maintain the <br /> median. <br /> 12. The City shall pay to the County 75% of the cost of concrete sidewalk on the east side <br /> of Silver Lake Road from 37`" Avenue to Silver Lane. Upon completion of the project, the City <br /> shall own and maintain the concrete sidewalk. <br /> 13. The City shall pay to the County 100% of the cost of streetlights provided in the <br /> • project. Upon completion of the project, the City shall own and maintain the streetlights. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.