Laserfiche WebLink
• from and against any and all liability for damage to the foregoing pipes, wires, conduits, <br /> sewers, piling or other obstructions, if any, caused by the construction or maintenance of <br /> Licensee's pipe line. The Railroad Company makes no representation by the granting of <br /> this license that its property is free of any such pipes, wires, conduits, sewers, pilings or <br /> other obstructions. The Licensee's obligations hereunder shall survive the termination or <br /> expiration of this agreement. <br /> 5. The Licensee shall not carry on any work in connection with the installation, <br /> maintenance, repair, changing or renewal of the pipe line underneath or in close proximity <br /> to any railroad track at the above described location before giving the Chief Engineer at <br /> least three (3) days'written notice at his headquarters located at Minneapolis, Minnesota, <br /> and not until an authorized representative of the Railroad Company shall be present to <br /> supervise same. Upon bills being rendered therefor,the Licensee shall promptly reimburse <br /> the Railroad Company for all expenses incurred by it in connection with such supervision, <br /> including all labor costs for flagmen supplied by the Railroad Company to protect railroad <br /> operations, and for the entire cost of the furnishing, installation and later removal of any <br /> temporary supports for said tracks, which said Chief Engineer or his authorized <br /> representative may consider necessary while such work is in progress. <br /> 6. The Licensee, at the Licensee's sole expense, whenever notified to do so, shall <br /> promptly make such repairs to or changes in the pipe line, including change in location, as <br /> • said Chief Engineer or his authorized representative shall for any reason consider <br /> necessary and require. The Railroad Company shall have the right, at its election, to make <br /> emergency repairs to the pipe line, and in such event the Licensee, upon bills being <br /> rendered therefor,will promptly reimburse the Railroad Company for all expenses incurred <br /> in connection therewith. <br /> 7. Maintenance and use of the pipe line upon and across the Railroad Company's <br /> property at the above described location, however long continued, shall not vest in the <br /> Licensee any rights adverse to those of the Railroad Company. <br /> 8. As one of the material considerations of this agreement, without which the <br /> license granted hereunderwould not be granted,the Licensee expressly assumes any and <br /> all risk of damage to or destruction of the pipe line through any cause whatsoever while <br /> located upon or across the Railroad Company's property, and hereby releases and agrees <br /> to indemnify, hold harmless and defend the Railroad Company and its directors, officers, <br /> stockholders, divisions, agents, affiliates, subsidiaries, predecessors, successors and <br /> assigns, or anyone acting on its behalf or their behalf, from and against any and all Claims <br /> (including without limitation any Claims arising under any Environmental Law and all <br /> Claims arising at common law, in equity or under a federal, state or local statute, rule or <br /> regulation) of every kind, past, present and future, existing and contingent, known and <br /> unknown, arising from any injury to persons, firms or corporations whomsoever(including <br /> the parties hereto and their employees, agents and invitees), including injuries resulting in <br /> death, and damage to property whatsoever (including property of the parties hereto), <br /> • wherever such persons or property are located, caused by or attributable to, in whole or <br /> FORM 300.4/97.STD <br /> PIPELINE (1X) NO. 30729 <br /> ST. ANTHONY(WILSON), MN -2- <br /> Canadian Pacific Railway <br />