My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 02212006
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2006
>
PL PACKET 02212006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:26:49 PM
Creation date
4/19/2016 4:26:31 PM
Metadata
Fields
SP Box #
33
SP Folder Name
PL PACKETS 2005-2011
SP Name
PL PACKET 02212006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A <br /> PROJECT DESCRIPTION <br /> TIF District No.3-5 currently consists of 24 parcels of land and adjacent and internal rights-of-way and is <br /> approximately 65 acres in size. TIF District No.3-5 is being created to facilitate the redevelopment of the <br /> Apache Plaza Shopping Center and surrounding area(commonly referred to as the Northwest Quadrant), <br /> in accordance with the Redevelopment Plan. Currently the Northwest Quadrant is underutilized, with <br /> obsolete structures and physical arrangements, substantial vacant areas and high building vacancies, <br /> inconsistent legal restrictions on redevelopment and outdated and inadequate public infrastructure and <br /> circulation. Redevelopment has been impeded by fragmentation of ownership and the difficulty of <br /> redevelopment without a consistent overall plan ensuring compatible adjacent uses. Due to these issues,the <br /> redevelopment of the Northwest Quadrant has been a priority redevelopment goal for the City for the past <br /> ten(10)years. <br /> The largest property within the Northwest Quadrant and the main impetus for the redevelopment is the <br /> Apache Plaza Shopping Center that is approximately 95%vacant. This 432,000+sq/ft mall was constructed <br /> back in the mid 1950's and was the second covered mall developed in the United States. After opening it was <br /> a thriving,regional mall that served the majority of the surrounding urbanized areas. <br /> At the time Apache Plaza was constructed,Silver Lake Road and CountyRoad D were major thoroughfares <br /> through the community,which are adjacent to the Mall. When Interstate 35W and 694 were constructed they <br /> became the major thoroughfares,thus deviating traffic away from Apache Plaza,which was the beginning <br /> of its decline. Also contributing to its decline were changes in retail trends and competition from modern <br /> shopping centers like Rosedale (located 3-5 miles away). This further caused Apache Plaza to become <br /> economically and functionally obsolete to the community and the region. As Apache continued its decline <br /> in valuation,the development was unable to attract new anchor tenants. As vacancies continually increased, <br /> the development could no longer support the outstanding debt on the property and US Bank had to foreclose <br /> upon the property in 1996(they currently retain ownership of it). Today,Apache Plaza is over 95%vacant <br /> and has declined in value by 54 percent since 1991. Due to the decline of Apache Plaza, several of the <br /> surrounding businesses were starting to feel the effects and decline as well. <br /> In addition to being economically and functionally obsolete,the existing Apache Plaza site is the second largest <br /> contributor ofpollutants,to Silver Lake(according to the Ramsay County&Rice Creek Watershed District <br /> Diagnostic Feasibility Study for Silver Lake). The Apache Plaza Site requires extensive storm water <br /> treatment as part of any redevelopment. Storm water treatment requirements have been a hindrance to <br /> redevelopment of this site in the past because of the large land commitment necessary to meet today's storm <br /> water treatment standards and the fiscal implications thereof. To date,there has been no funding available <br /> to retroactively address the water quality issues generated from the Apache Plaza site. The only opportunity <br /> to address these issues financially is through this comprehensive redevelopment opportunity and the <br /> establishment of a Redevelopment TIF District.. <br /> In 2000,the City was approached by a Developer to redevelop Apache Plaza. The Developer proposed to <br /> rehabilitate the existing Mall and convert it into office/warehouse space. The City Council rejected the <br /> proposal because they didn't view that turning the Mall into an industrial park was the long-term solution for <br /> the communityand that the e proposal did not address the existing water quality issues. In light of this decision <br /> the City Council undertook a community based planning effort in 2000 to address redevelopment of the <br /> Northwest Quadrant. In 2001 a community consensus was reached that the goal of the redevelopment should <br /> APPENDIX A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.