Laserfiche WebLink
A <br /> WSB <br /> RNMEM <br /> &Associates,Inc. Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South <br /> Suite 300 <br /> Minneapolis,MN 55416 <br /> Tel:763-541-4800 <br /> Fax:763-541-1700 <br /> February 27, 2006 <br /> Mr. Craig Schlichting <br /> Plow Engineering <br /> 9180 Lexington Avenue NE <br /> Circle Pines, MN 55014 <br /> Re: Review of Proposed Silver Lake Road Office Building <br /> City of St. Anthony <br /> WSB Project No. 1626-17 <br /> Dear Mr. Schlichting: <br /> We have received the February 24, 2006, proposed plans for the Silver Lake Road Office <br /> Building in the City of St. Anthony. Based on our review of these plans,we offer the following <br /> comments: <br /> 1. The proposed plan is consistent with the hydrologic/hydraulic calculations that <br /> were submitted with the previous Tire's Plus plan. <br /> 2. Please provide the City with a copy of your MPCA NPDES permit application <br /> and stormwater pollution prevention plan for construction of the proposed <br /> improvements as it is a connected action with the previous Tire's Plus plan. <br /> 3. Identify elevation, direction, and location of the EOF for CB 1. The EOF route <br /> should avoid directing drainage to the adjacent south property. <br /> 4. The existing pond outlet is a two-stage outlet structure and a riprap emergency <br /> overflow swale. The current configuration allows water to leave the pond through the <br /> riprap emergency overflow before it enters the second stage of the outlet structure. <br /> This situation should be corrected to allow water to enter the second stage of the <br /> outlet structure before it reaches the riprap overflow swale. Please provide as-built <br /> information for the pond outlet structure showing that this was corrected. <br /> Minneapolis 1 St Cloud K:101626-171AdminlDocsVYR-PLOWENG-022406.doc <br /> Equal Opportunity Employer <br />