My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 07152008
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2008
>
PL PACKET 07152008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:29:09 PM
Creation date
4/19/2016 4:29:02 PM
Metadata
Fields
SP Box #
33
SP Folder Name
PL PACKETS 2005-2011
SP Name
PL PACKET 07152008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> } <br /> Silver Lake Road (C.SAH- 13 6) Infrastrugft ar <br /> Improvements Project <br /> June 1, 2008 <br /> Hennepin Countyw. <br /> Issue z City of St.Anthony <br /> Project Update <br /> The Silver Lake Road (C.S.A.H. 136) project continues to move <br /> forward in the month of June on schedule. The project will be <br /> y-L= moving from south to north with sanitary sewer and watermain <br /> -r installation occurring in front of the roadway construction work. <br /> Hennepin County is working with the Contractor to minimize the <br /> area of roadway disturbed at any one time, this effort is the reason <br /> pavement or driveways have not been disturbed north of Townview <br /> Avenue while crews were working in the month of May. The effort is <br /> intended to allow the Contractor to complete the work in a timely <br /> fashion while minimizing the duration that homes and facilities will be <br /> impacted by the construction. Work will continue to the north as <br /> underground construction is completed. As soon as possible, crews <br /> will pave sections of roadway beginning at the southern end of the <br /> project moving to the north as quickly as work can commence. <br /> F: <br /> y <br /> Y Project Purpose Statement <br /> "Enhance the function of the transportation system in the area, maintain the <br /> infrastructure serving the residents, and provide the residents of the City of <br /> alll t}�^may St. Anthony an improved roadway facility that maintains the character of the <br /> C illa C� City. „ <br />
The URL can be used to link to this page
Your browser does not support the video tag.