My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 01202009
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2009
>
PL PACKET 01202009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:29:50 PM
Creation date
4/19/2016 4:29:45 PM
Metadata
Fields
SP Box #
33
SP Folder Name
PL PACKETS 2005-2011
SP Name
PL PACKET 01202009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions Attached to Lot Split <br /> 1. Lot coverage Limitation/applicability of Zoning Code St. Anthony Business Center <br /> Corporation(SABC)and St.Anthony East, LLC (SAE)agree that the entire parcel <br /> legally described in paragraph 4 herein("Parcel") shall, for zoning purposes, be <br /> considered a single zoning lot,notwithstanding any new lot of record created by the <br /> administrative lot division. SABC and SAE agree the administrative lot division does not <br /> constitute a waiver of, nor does it supersede, any state statutes of local ordinances <br /> pertaining to zoning. SABC, SAE or any subsequent owner or lessee of any lot of record <br /> created by the administrative lot division shall, notwithstanding the preceding,have the <br /> right to construct,reconstruct or otherwise reconfigure new or existing improvements on <br /> the entire Parcel so long as such improvements taken together with the improvements <br /> existing on the entire Parcel will be in compliance with applicable provisions of the City <br /> of St. Anthony Legislative Code or so long as the necessary variances are obtained. <br /> 2. BuildingCode applicability. SABC and SAE agree that for purposes of Chapter 5 in <br /> the 1997 Uniform Building Code, the new property line created by the administrative lot <br /> division shall be ignored and the entire Parcel shall be treated as one (1) lot for purposes <br /> of applying the General Building Limitations. <br /> 3. Legal Effect. Each new parcel created by the administrative lot division is subject to <br /> this agreement which constitutes a restrictive covenant which shall run with the land and <br /> be binding upon SABC, SAE, their successors,heirs and assigns. <br /> 4. Legal Description of Parcel: <br />
The URL can be used to link to this page
Your browser does not support the video tag.