My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 05182010
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2010
>
PL PACKET 05182010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:31:58 PM
Creation date
4/19/2016 4:31:53 PM
Metadata
Fields
SP Box #
33
SP Folder Name
PL PACKETS 2005-2011
SP Name
PL PACKET 05182010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Planning Commission Regular Meeting Minutes <br /> April 20, 2010 <br /> Page 3 <br /> 1 Chair Jensen clarified that a one foot variance for the overhang and a six foot variance for the <br /> 2 footings will be required. <br /> 3 <br /> 4 Commissioner Chaput verified with Mr. Battles that the existing footing structure line will be <br /> 5 maintained and that the front walk will be new. <br /> 6 <br /> 7 Chair Jensen asked if Acacia Architects completed the measurements to the curb to verify the <br /> 8 front property line. Mr. Battles replied that the original survey on the property was used and will <br /> 9 be submitted with the plans. <br /> 10 <br /> 11 Chair Jensen closed the public hearing at 7:21 p.m. <br /> 12 <br /> 13 Motion by Chair Jensen, seconded by Commissioner Niccum, to recommend approval of a one <br /> 14 (1) foot variance to the allowable five (5) foot front yard encroachment based on the Findings of <br /> 15 Fact as determined during the Public Hearing. <br /> 16 <br /> 17 Motion carried unanimously. <br /> 18 <br /> 19 VIII. CONCEPT REVIEWS <br /> 20 <br /> 21 VIII.1. PUD AMENDMENT FOR SIGNAGE AT SLV —DORAN COMPANIES <br /> 22 <br /> 23 Assistant City Manager Moore-Sykes stated staff met with Ms. Brenda Thomas, Vice President, <br /> 24 Property Management, Doran Companies, and her staff to discuss the possibility of amending the <br /> 25 current PUD that was established as part of the redevelopment of the Apache Plaza into the <br /> 26 current Silver Lake Village. The purpose of this amendment is to allow for more signage for the <br /> 27 tenants at Silver Lake Village. <br /> 28 <br /> 29 Mr. Dale Wenkus, Architect representing Doran Companies, addressed the Planning <br /> 30 Commission and stated that the issue of signage continues to be raised at Silver Lake Village. <br /> 31 He stated the Center is unique, and all the stores are not visible to the main road. They <br /> 32 understand this is a PUD and requested to attend this meeting to informally discuss additional <br /> 33 signage for the center. The request includes modifications to two existing signs and three <br /> 34 additional signs for the site. <br /> 35 <br /> 36 Mr. Wenkus presented photographs of existing signage and the site plan of proposed sign <br /> 37 modifications at Silver Lake Village. Mr. Wenkus and Ms. Thomas answered questions of the <br /> 38 Planning Commission on the proposed sign modifications and the process for tenant exposure on <br /> 39 signage in the center. It was explained that the purpose of the signage close to the road is <br /> 40 exposure for the smaller tenants. There are currently 15 tenants without signage space at the <br /> 41 center. The total area of the existing signage is approximately 600 square foot. The total <br /> 42 additional signage area requested is approximately 200 square feet. <br /> 43 <br /> 44 <br /> 45 Chair Jensen expressed concern with the proposed height of nine feet for the additional signage. <br /> 46 He suggested the applicant provide a mockup of the signage in the proposed locations for the <br />
The URL can be used to link to this page
Your browser does not support the video tag.