My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 11152011
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2011
>
PL PACKET 11152011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:32:45 PM
Creation date
4/19/2016 4:32:38 PM
Metadata
Fields
SP Box #
33
SP Folder Name
PL PACKETS 2005-2011
SP Name
PL PACKET 11152011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e ) <br /> Parking Breakdown <br /> Existing AW 59 Surface Spaces <br /> 7 unusable after construction <br /> 14 used by existing resident <br /> TOTAL 38 <br /> Proposed AW II <br /> 13 Surface Spaces NE Kenzie <br /> 13 Surface Space SW end of building <br /> 18 Underground Spaces <br /> TOTAL 44 <br /> TOTAL: Both buildings 82 <br /> Staff needed parking 36 <br /> Resident needed <br /> parking 12 <br /> TOTALEXTRA 34 <br /> It's important to note, those 36 staff members listed above would be new jobs for the <br /> community. These positions would be a mix of housing operations,maintenance, full time and <br /> part time office workers as well as kitchen&dining room wait staff and a number of Health Care <br /> positions including Home Health Aides and Registered Nurses. This does not include the <br /> obvious number of construction jobs that will be created building this 72 unit building. All job <br /> opportunities will be a great asset to the City of St. Anthony community. <br />
The URL can be used to link to this page
Your browser does not support the video tag.