My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05242016
StAnthony
>
City Council
>
City Council Packets
>
2016
>
CC PACKET 05242016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2016 1:54:57 PM
Creation date
5/25/2016 1:50:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6 <br /> <br />3.1 System Acceptance Testing. <br /> <br />(a) Operator must test the System in accordance with such methods, acts, guidelines, <br />standards and criteria reasonably accepted or followed by photovoltaic solar system integrators in <br />the United States and as otherwise required by the PPA and the NSP Tariff. <br /> <br />(b) Commercial Operation occurs when the “Date of Commercial Operation” occurs under <br />the PPA. At least a week before the Date of Commercial Operation, Operator will send a written notice <br />to Subscriber providing the Date of Commercial Operation and the provided date will be the <br />Commercial <br />Operation Date for the purposes of this Agreement. Operator has the sole responsibility to notify NSP <br />of this date and get any necessary approvals from NSP. <br /> <br />(c) A copy of the warranty for the solar panels is attached to this Agreement as Exhibit B. <br /> <br />4. SYSTEM OPERATIONS. <br /> <br />4.1 Operator as Owner and Operator. The System will be owned by Operator or Operator’s <br />Financing Party and will be operated and maintained in accordance with the PPA and the NSP Tariff <br />and, as necessary, maintained and repaired by Operator at its sole cost and expense. Installation of the <br />System, upgrades and repairs will be under the direct supervision of an NABCEP-certified solar <br />professional. Maintenance will be performed according to industry standards, including the <br />recommendations of the manufacturers of solar panels and other operational components. <br /> <br />4.2 Metering. There will be two meters installed and maintained by NSP, which will <br />measure the amount of electrical energy flowing to and from the Premises as further described in <br />the PPA. The Production Meter (as defined in the PPA) will record the amount of Delivered <br />Energy. <br />Operator will make the raw meter data available to Subscriber upon Subscriber’s request. <br /> <br /> <br />5. DELIVERY OF ENERGY. <br /> <br />5.1 Purchase Requirement. Subscriber agrees to make payments calculated as Subscriber’s <br />Allocated Percentage multiplied by (x) Delivered Energy generated by t he System beginning on the <br />Commercial Operation Date and continuing for each applicable month of the Term and (y) the kWh Rate. <br />If there is a difference between the metered energy credited by NSP to the Subscriber on the subscribed <br />account’s bills and the Delivered Energy, the Subscriber’s payments will be based on energy credited. <br /> <br />5.2 Estimated Annual Delivered Energy. The total annual estimate of Delivered Energy for <br />any given year is the “Estimated Annual Delivered Energy.” The Estimated Annual Delivered Energy <br />and the estimated amount of electricity to be allocated to Subscriber for each year of the Term starting on <br />the Commercial Operation Date are identified in Exhibit F. The estimated amount of electricity <br />allocated to Subscriber is Subscriber’s Allocated Percentage of the Estimated Annual Delivered Energy. <br />5.3 Environmental Attributes and Solar Incentives. <br /> <br />56
The URL can be used to link to this page
Your browser does not support the video tag.