My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION 05172016
StAnthony
>
City Council
>
City Council Work Session
>
2016
>
CC WORKSESSION 05172016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2016 3:29:17 PM
Creation date
6/23/2016 3:28:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S I L V E R L A K E R D <br />37TH AVE NE <br />29TH AVE N E <br />37TH AVE N E <br />33RD AVE N E <br />36TH AVE N E <br />31ST AVE N E <br />H I G H W A Y N O 8 8 <br />S <br />T <br /> <br />A <br />N <br />T <br />H <br />O <br />N <br />Y <br /> <br />B <br />L <br />V <br />D <br />S T I N S O N B L V D N E <br />B E L D E N D R <br />F O S S R D <br />39TH AVE NE <br />32ND AVE N E <br />E D W A R D S T N E <br />O L D H W Y 8 <br />SILVER LN <br />K E N Z I E T E R <br />R A N K I N R D <br />H I G H C R E S T R D <br />H C R R A C O R R I D O R <br />30TH AVE N E <br />34TH AVE N E <br />ASH <br />TOWNVIEW AVE <br />35TH AVE N E <br />PAHL AVE <br />HILLDALE AVE N E <br />H A R D I N G S T N E <br />27TH AVE N E <br />W I L S O N S T N E <br />S K Y C R O F T D R <br />C O O L I D G E S T N <br />E <br />C R O F T D R <br />MURRAY AVE <br />ARMOUR TER W <br />ELM <br />S T I N S O N B L V D N E <br />P E N R O D L N <br />S T I N S O N P K W Y N E <br />M A C A L A S T E R D R <br />C H A N D L E R D R <br />F O R D H A M D R <br />P I N E <br />C R E S T V I E W D R <br />S H A M R O C K D R <br />EDGEME RE AVE <br />DOWNERS DR <br />38TH AVE NE <br />G U M <br />WENDHURST AVE <br />R O O S E V E L T S T N E <br />A N T H O N Y L A <br />A N T H O N Y L A S <br />SKYCROFT CIR <br />W A L N U T S T <br />S I L V E R L A K E C T <br />34TH AVE N <br />SIL <br />V <br />E <br />R <br /> L <br />A <br />K <br />E <br /> T <br />E <br />R <br />COUNTY ROA D E W <br />LOWRY AVE N E <br />S I L V E R L N <br />R O O S E <br />V E L T S T N E <br />H I G H C R E S T R D <br />K E N Z I E T E R <br />S I L V E R L A K E R D <br />S I L V E R L A K E R D <br />S K Y C R O F T D R <br />C O O L I D G E S T N E <br />C R O F <br />T D R <br />R O O S E V E L T S T N E <br />0 0.25 0.50.125 Miles ¯ <br />1. 2016 Street Project <br />2. Sidewalk <br /> Constructed per HSIP Grant <br /> (2016) <br />3. Salo Pond <br /> Silver Lake water quality <br /> improvement (Completed in 2015) <br />4. Dominium Development <br /> Approved high density senior <br /> housing (Completed in 2015) <br />5. Gas Station/Car Wash Site <br /> Potential future red evelopment <br /> op portunity <br />6. Vacant Lot <br /> Future Redevelopment <br />8. Flooding Areas <br /> Completed in 2015 <br /> <br />17. St. Anthony Regional <br /> Treatment System <br />14. Lowry Grove <br /> Future redevelopment opportunity <br />22. Industrial Park Future Redevelopment <br /> Futu re oppo rtunities for redevelopment <br />21. Ramsey County Recon Project <br /> Futu re proje ct 2018 <br /> Coordination with Hennepin County <br />20. Industrial Park Flooding <br /> Futu re construction of stormwater <br /> ponding on easement <br />26. 2015 Road Project - Elmwood <br /> Trees <br /> Restoration <br />25. Raingarden/Bioswale Project <br /> Water quality credits for RCWD permit <br /> (Completed in 2015) <br />31. Flooding Areas <br /> Contin ued coordination with <br /> Ramsey County <br /> <br />Signal Improvements <br />Funding from HSIP Grant <br />(8) 2016 construction <br />Hennepin County funding <br />contribution (Completed in 2015) <br /> 29. Mirror La ke Flooding <br /> RCW D Cle an Water Fund Grant <br /> (Construction in 2016) <br />13. LED Pedestrian Crossing <br />Funded by MWMO <br />Construction in 2016 <br />18. Future MPRB Trail <br />Potential future trail per <br />Henn. Co. Bike Plan <br />9. Future MPRB Trail <br />Potential future trail per <br />Henn. Co. Bike Plan <br />23. Pedestrian Improvement <br />7. Vacant Gas Station <br /> Tank removal required <br /> by January 2018 <br />10. 29th and Silver Lake <br /> Road Intersec tion <br /> <br />15. Former Bowling Alley Site <br />Future redevelopment <br />Master Plan <br /> 30. Houses on 3 9th <br /> <br />Coordination with Hennepin County <br />Future Redevelopment Oppo rtunity <br />11. Alley Overlay <br /> (Completed in 2015) <br /> <br />16. TAP Study Area <br />19. Mill + Overlay <br /> (Comp leted in 2015) <br />24. Advance oxidation plant <br /> addition to WTP <br />Construction in 2017 <br /> 28. Central Park Entrance <br /> 27. 2017 Road Project <br />12. Potential Park <br />Tour of the City - 2016
The URL can be used to link to this page
Your browser does not support the video tag.