Laserfiche WebLink
I&I <br />Description <br />SAVLiquor <br />The proposed project is a liquor store for the City of St. Anthony Village of approximately 8,500 <br />square feet consisting of a 4,800 square foot addition and the remodeling of approximately 3,700 <br />square feet of the existing Tires -Plus Building at Apache Plaza in St. Anthony Village, <br />Minnesota. Tires -Plus remains a tenant in the south end of the building occupying <br />approximately 6,800 square feet. The Architect's basic services do not include any work <br />associated with either the exterior or interior of the Tires -Plus portion of the building. <br />The remodeling will include the demolition of an existing 1,475 square foot mezzanine, the <br />removal of a stair into the existing basement and inftll of the existing stair opening, infill of <br />existing exterior wall openings and addition of new exterior wall openings. The new addition <br />will be a one -story building with a new stair to the existing basement. There will be no canopy <br />overhang on the new addition. The structural system will consist of a steel bar joist/metal deck <br />roof system supported by an interior steel beam and column line and exterior load bearing CMU <br />walls. <br />The Schematic Design Phase has been completed under a separate contract. The project will <br />proceed based on the Schematic Design drawings prepared by KKE Architects, Al - A3 dated <br />August 13, 1996. The Architect's basic services consist of those described herein and include <br />normal Structural, Mechanical, EIectrical and Civil Engineering. <br />The project has already received Planning Commission and City Council approval. It is <br />anticipated that Authorization to Proceed with the remaining phases of the project will occur in <br />mid - March. The project will be competitively bid and will be awarded to the lowest qualified <br />bidder. We will not be responsible for preparing any Statements of Probable Construction Costs. <br />The Owner is proceeding with the project based on the Valu Engineering of a previous <br />Preliminary Cost of Construction prepared by Welsh Construction. Any changes to the project <br />after the bids are received as a result of the project being over the Owner's budget shall be <br />considered as additional services. <br />A preliminary project schedule is attached. <br />&&L Architects <br />i de Lr y 25, 1991 <br />fit 9503117925,PM,0,6 <br />80 /ZO'd LH6 +Zb£ +Zi9 ON XU 3NN Wd 9£20 0817 L6- 2-889 <br />