Laserfiche WebLink
• 1 Siting <br />2 <br />Would <br />wrap the <br />buildings around the exterior and create a <br />3 <br />focal <br />point in <br />the middle with an entryway off Kenzie <br />Terrace <br />4 <br />to accept this <br />project rather than the Walker Senior <br />project; <br />5 <br />019 <br />keep snow off in this climate; <br />20 <br />6 <br />would <br />do a lot <br />with landscaping around the retention <br />pond. <br />7 <br />Parking <br />22 <br />these are very <br />important. <br />8 Said would provide 206 parking stalls in underground garages; <br />9 177 on the surface plus another 27 ancillary spaces to meet <br />10 ordinance requirements. <br />11 Buildings <br />12 Three 3 story, with a total of 201 units; <br />13 Building A, 96 units; Building B, 51 units; and Building C, 54 <br />14 units; <br />15 <br />all three would <br />have brick exteriors with wood as an accent <br />16 <br />principally around balconies to avoid <br />"institutional look" to <br />17 <br />the buildings; <br />18 <br />hip roofs would <br />look more residential <br />and would be easier to <br />019 <br />keep snow off in this climate; <br />20 <br />balconies would <br />be pulled out from the <br />buildings and lots of <br />21 <br />angles would be <br />provided because from <br />a marketing standpoint <br />22 <br />these are very <br />important. <br />23 Phasing <br />24 Said would clear site as soon s City acquires it. Said under - <br />25 stood that would be sometime after September 15th; <br />26 would start construction as soon as possible in the spring <br />27 by April 1st, but sooner if weather, demolition and site <br />28 preparation permitted; <br />29 would construct Building A, the larger building with 96 units <br />30 of market rent first, but at same time would start Building C <br />31 which would be rented for 55 and over; <br />32 leasing would start around the middle of December, 1988, but <br />33 wouldn't anticipate buildings would be filled up until June or <br />34 July, 1989; <br />35 Building B would be started in the spring of 1989. Lang - <br />36 Nelson plans it for 55 and over but wants the option of <br />•37 <br />3 <br />