Laserfiche WebLink
<br /> <br />2017 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 2170-34 PAGE 5 <br />3.4 Streets <br />The proposed reconstruction area consists of 30-foot-wide concrete streets with curb and <br />gutter. Soil borings will be completed during final design to determine the underlying <br />soils in the area. Soil borings completed with the 2015 Street and Utility Improvements <br />project along 36th Avenue and Chelmford Road (located adjacent to the 2017 project <br />limits) indicated the underlying soils consist of silty clay fill or sandy clay fill. Given the <br />the close proximity of the roads reconstructed in 2015 with the roads identified for <br />improvement in 2017, the underlying soils are assumed to be similar. <br />23