My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08232016
StAnthony
>
City Council
>
City Council Packets
>
2016
>
CC PACKET 08232016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 3:33:17 PM
Creation date
8/18/2016 3:30:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2017 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 2170-34 PAGE 8 <br />4.7 Additional Considerations <br /> <br />Alternate improvements proposed along Silver Lake Court include reconstructing the <br />roadway as identified in Section 4.4 and replacing the existing sanitary and water main <br />facilities as identified in Sections 4.1 and 4.2. Drainage improvements include removing <br />and replacing the existing storm sewer system and supplementing the existing storm <br />sewer facilities with the installation of additional catch basins, as necessary. <br /> <br />Silver Lake Court is identified to be reconstructed in 2025 in the City’s Street and Utility <br />Reconstruction Program, at the same time Silver Lane and Silver Lake Terrace are <br />proposed to be reconstructed. Silver Lake Court, however has been identified to be in <br />such condition that resurfacing of the roadway needs to be completed earlier then <br />identified in the City’s Street and Utility Reconstruction Program. The total estimated <br />cost to resurface Silver Lake Court is $60,700. <br /> <br />Mill and overlay improvements are recommended along Silver Lake Court to extend the <br />life of the roadway until the road can be reconstructed with Silver Lane and Silver Lake <br />Terrace to reduce total project costs and take advantage of low bond rates by <br />reconstructing a larger project area (economies of scale). <br /> <br />26
The URL can be used to link to this page
Your browser does not support the video tag.