Laserfiche WebLink
<br /> <br />2017 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 2170-34 PAGE 12 <br />7. FEASIBILITY AND RECOMMENDATION <br />Project costs are anticipated to be approximately $3.01 million. <br /> <br />Due to the poor structural condition of portions of the street sections, the deterioration of <br />the existing sanitary sewer system and frequent water main breaks, this project is both <br />feasible and necessary from an engineering standpoint. Alternative methods of improving <br />the utility systems and roadways are not feasible or cost effective due to the location and <br />condition of the existing utilities. <br /> <br />Based on our analysis and data presented, the proposed project is feasible, necessary, and <br />cost effective from an engineering standpoint. We recommend reconstruction of the <br />sanitary sewer, water main, stormwater collection system, and the street as detailed in this <br />report. <br />30