My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08232016
StAnthony
>
City Council
>
City Council Packets
>
2016
>
CC PACKET 08232016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 3:33:17 PM
Creation date
8/18/2016 3:30:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2017 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 2170-34 PAGE 12 <br />7. FEASIBILITY AND RECOMMENDATION <br />Project costs are anticipated to be approximately $3.01 million. <br /> <br />Due to the poor structural condition of portions of the street sections, the deterioration of <br />the existing sanitary sewer system and frequent water main breaks, this project is both <br />feasible and necessary from an engineering standpoint. Alternative methods of improving <br />the utility systems and roadways are not feasible or cost effective due to the location and <br />condition of the existing utilities. <br /> <br />Based on our analysis and data presented, the proposed project is feasible, necessary, and <br />cost effective from an engineering standpoint. We recommend reconstruction of the <br />sanitary sewer, water main, stormwater collection system, and the street as detailed in this <br />report. <br />30
The URL can be used to link to this page
Your browser does not support the video tag.