My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08232016
StAnthony
>
City Council
>
City Council Packets
>
2016
>
CC PACKET 08232016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 3:33:17 PM
Creation date
8/18/2016 3:30:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mirror Lake Concept Plan <br />1)Excavate Lake <br />2)Replace Outlet <br />Structure <br />3)Construct Flood <br />Control Berm <br />4)Stabilize Shoreline <br />1) Excavate Lake <br /> •Remove <br />unconsolidated <br />nutrient rich soils <br />•Increase lake volume <br />below Normal Water <br />Level (NWL) <br />•Improve habitat <br />•Slow the <br />accumulation of <br />sediment deltas <br />•Avoid disturbing <br />NuStar’s petroleum <br />pipeline <br />69
The URL can be used to link to this page
Your browser does not support the video tag.