Laserfiche WebLink
Johnson <br />controls <br />III. Facility & Infrastructure Overview <br />Johnson Controls' professionals have spent considerable time in your buildings analyzing physical <br />building attributes, operational characteristics, mechanical systems and the overall environment. <br />Several City staff members have been interviewed and have made various recommendations. This <br />section summarizes the surveys, provides energy analysis results, and provides Johnson Controls' <br />recommendations. Items included in the $2.6M project are highlighted in yellow within each <br />Building Improvement Measure (BIM #) Summary. <br />The following facilities were evaluated: <br />1) City Hall <br />2) Fire Station <br />3) Public Works Facility <br />4) Water Treatment Plant <br />5) Liquor Stores —North and South <br />Page 6 <br />RORPIE Performance Contract Analysis <br />NOT TO BE REPRODUCED OR DISTRIBUTED W TI OUT JOHNSON CONTROLS' PERMISSION <br />