My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION 01292008
StAnthony
>
City Council
>
City Council Work Session
>
2008
>
CC WORKSESSION 01292008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2016 10:44:00 AM
Creation date
11/23/2016 10:39:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIM <br />CH2 <br />Johnson 010 <br />Controls <br />Boiler Plant Conversions and Modifications Continued <br />City Hall <br />• Evaluate the loads of the building and rebalance the new ventilation rates for each <br />zone with a registered balancer. <br />• Remove existing boiler, water heaters and ancillary equipment <br />• Install four new 500 MBH modular high efficiency condensing sealed combustion hot <br />water boilers <br />• Tie into new Facility Management System <br />• Install two high efficiency domestic 80 MBH Water Heaters <br />• Install new Finned Tube Radiation in selected areas <br />0 1) Police Department — Chief Office <br />0 2) Police Department — DARE Room <br />0 3) Police Department — Roll Call <br />0 4) City Offices — Lunch Room <br />0 5) City Offices —Finance Director <br />0 6) City Offices — Book Keeping <br />0 7) City Offices — Public Works <br />0 8) City Offices — City Clerk <br />0 9) City Offices — Asst. City Manager <br />0 10) City Offices — City Manager <br />0 11) School Offices — Office (Three Offices) <br />Risks of not implementing the recommendations <br />• Non - replacement will result in continued repair and service call expenses. <br />• Failed equipment may require complete and costly replacement, possibility at an <br />inappropriate time. <br />• Continued repair / maintenance costs to keep these old units operating. <br />• Unplanned failure and required replacement of this equipment can cause <br />uncomfortable indoor temperatures. <br />• Equipment failure may occur at a time when the budget expense is unplanned. <br />• Equipment failure in the heating months could require closing the building or use of <br />costly rented equipment during the ordering, delivery and installation of the new <br />• Better able to match the buildings heating requirements. <br />• Increased comfort <br />• Energy savings <br />• Reduced maintenance costs <br />• Extrnd Pn i_+ 1 ;F <br />Page 14 City of St. Anthony Village <br />Performance Contract Analysis <br />NOT TO BE REPRODUCED OR DISTRIBUTED WrHOUT JOHNSON CONTROLS' PERMISSION <br />
The URL can be used to link to this page
Your browser does not support the video tag.