My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION 01292008
StAnthony
>
City Council
>
City Council Work Session
>
2008
>
CC WORKSESSION 01292008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2016 10:44:00 AM
Creation date
11/23/2016 10:39:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />Awkea EysecIton <br />I <br />i <br />- 10.0w <br />El <br />-4.3:w t_1 <br />with <br />year guarantee. <br />-S.STO Spn <br />0 Tear off existing roof. Replace entire roof with 5 -ply built -up roofing 30- <br />1.r iapA <br />Approx. Total Area: 43.065 Sq Ft <br />gr <br />Johnson * <br />Controls <br />St. Anthony - City Hall <br />All of the roofs will require the existing roof to be removed. The assumption has been made that the <br />existing roof structure of both the city hall and the water tank is in good shape for a new roof. <br />Green Roof <br />0 T ear off existing roof. Replace entire roof with 5 -ply built -up roofing system 30- <br />with <br />year guarantee. <br />rFIM <br />0 Tear off existing roof. Replace entire roof with 5 -ply built -up roofing 30- <br />system with <br />year guarantee. Add a green roof on section B of the building <br />• Tear off existing foam roof. Replace entire roof with 5 -ply built -up roofing system <br />with 30 -year guarantee. <br />I <br />. Tear off existing foam roof. Replace entire roof with a green roof <br />® <br />Area B <br />Ae.a_. <br />a: <br />A.0 <br />EE <br />Area 0 <br />All of the roofs will require the existing roof to be removed. The assumption has been made that the <br />existing roof structure of both the city hall and the water tank is in good shape for a new roof. <br />Page 28 City of St. Anthony Village <br />Performance Contract Analysis <br />R0RPIETMTAND NFIDE PL <br />NOT TO BE REPRODLCED OR DISTRIBUTED WRNOUT JOHNSON CONRtOLS' PERMISSION <br />Green Roof <br />0 T ear off existing roof. Replace entire roof with 5 -ply built -up roofing system 30- <br />with <br />year guarantee. <br />rFIM <br />0 Tear off existing roof. Replace entire roof with 5 -ply built -up roofing 30- <br />system with <br />year guarantee. Add a green roof on section B of the building <br />• Tear off existing foam roof. Replace entire roof with 5 -ply built -up roofing system <br />with 30 -year guarantee. <br />I <br />. Tear off existing foam roof. Replace entire roof with a green roof <br />Page 28 City of St. Anthony Village <br />Performance Contract Analysis <br />R0RPIETMTAND NFIDE PL <br />NOT TO BE REPRODLCED OR DISTRIBUTED WRNOUT JOHNSON CONRtOLS' PERMISSION <br />Risks of not implementing the recommendations <br />• The aging roof produces additional leaks and this can damage valuable equipment <br />within the building. <br />• The roof fails at an inappropriate time and causes budget shortfalls. <br />• Continued repair and maintenance costs prove very costly. <br />Page 28 City of St. Anthony Village <br />Performance Contract Analysis <br />R0RPIETMTAND NFIDE PL <br />NOT TO BE REPRODLCED OR DISTRIBUTED WRNOUT JOHNSON CONRtOLS' PERMISSION <br />Benefits <br />• Reduced energy consumption <br />• Reduced urban `heat island" effect <br />• Sound insulation <br />• Extended roof life <br />• Storm water management <br />• Prevention of interior damage to equipment and the building structure. <br />• Use of "Green" solutions on City property sends the right message to City residents. <br />Page 28 City of St. Anthony Village <br />Performance Contract Analysis <br />R0RPIETMTAND NFIDE PL <br />NOT TO BE REPRODLCED OR DISTRIBUTED WRNOUT JOHNSON CONRtOLS' PERMISSION <br />
The URL can be used to link to this page
Your browser does not support the video tag.