costs based of the subsequent feasibility report from the City Engineer. The costs per the feasibility <br />report were approximately $20,000 less than the estimate used in the work session. Therefore the <br />projected levy impact of 2017 street project has not significantly changed. <br />Buildings Improvement Fund <br />The long term viability of the Building Improvement Fund has benefited from three elements in 2016. As <br />mentioned earlier the renegotiation of the school district lease provides for a greater transfer from the <br />Community Center Fund to the Building Improvement Fund. <br />Secondly, water treatment plant building improvement needs of $336,000 have been reassigned to the <br />proposed Utility Infrastructure Fund. Lastly, the with the closing of the water filtration fund the 2017- <br />2033 public works building costs relative to housing utility equipment was factored into the distribution. <br />The levy support for 2017 is set at $73,000. The levy is proposed to increase by $5,000 a year to keep <br />pace with the foreseeable needs and inflation. By the end of 2033 the fund is projected to have <br />significant funds on hand. It is important to note that City Hall Building will be 37 years old by 2023 and <br />may need major structural repairs. <br />Stormwater Fund <br />The retirement of stormwater bonds in 2015 has freed up the stormwater charges for storm water pond <br />silt removal, clean outs of water re-use tanks, water quality treatment operating costs, capital <br />improvements and support for the debt levy reduction program. The Fund has also benefited from <br />significant grants for capital improvements. <br />The replacement of the street sweeper has been reassigned from the Capital Equipment fund to the <br />Stormwater Fund. The main purpose of street sweeping is to prevent silts and road contaminants from <br />entering the stormwater system. Therefore it is reasonable that stormwater charges help support the <br />replacement of the street sweeper. <br />The Stormwater Fund shows significant funds accumulated by 2033. However it is reasonable to expect <br />that with further redevelopment (and increasing storm severity) that more stormwater management <br />facilities and flood control projects will follow. While the specific needs and timing are yet to be <br />determined it is prudent to maintain the funding necessary to meet these needs as they arise. <br />Parks Improvement Fund <br />The Parks Improvement Fund is projected to have substantial park dedication fees in connection with <br />the pending redevelopment of the Lowry Grove site. The Park Commission has reviewed park amenities <br />and has suggested additional seating and shade structures near the splash pads. These improvements <br />have been reflected in the 2018 budget. The Park Commission is further evaluating the replacement <br />schedule timing and associated costs with the assistance of the Public Works Director. The completion <br />of that effort will populate the improvement plan with dates and costs <br />Summary <br />The proposed 2017 Capital Funds budgets align revenue sources with appropriate needs demonstrated <br />by the buckets concept laid out in the 2014 budget cycle. The goal in this prior discussion was to develop <br />a plan to achieve structural balanced and sustainable funds. The proposed budget represents significant <br />progress made in reaching that goal. <br />