My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01312017
StAnthony
>
City Council
>
City Council Work Session
>
2017
>
CC WORKSESSION PACKET 01312017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 9:19:46 AM
Creation date
1/25/2017 9:17:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item <br />Number Unit Quantity Unit Cost Estimated <br />Cost <br />1 LS 1 $25,000.00 $25,000.00 <br />2 LS 1 $1,000.00 $1,000.00 <br />3 EA 1 $2,000.00 $2,000.00 <br />4 EA 1 $5,000.00 $5,000.00 <br />5 LF 100 $30.00 $3,000.00 <br />6 EA 1 $58,000.00 $58,000.00 <br />7 EA 1 $70,000.00 $70,000.00 <br />8 LS 1 $5,000.00 $5,000.00 <br />9 LF 75 $40.00 $3,000.00 <br />10 EA 1 $1,500.00 $1,500.00 <br />11 LS 1 $750.00 $750.00 <br />$174,250.00 <br />$43,600.00 <br />$217,850.00 <br />$32,700.00 <br />$250,550.00 <br />Description <br />MOBILIZATION <br />DISCONNECT/RECONNECT WATER SERVICE <br />SALVAGE AND REINSTALL LANDSCAPE <br />CONSTRUCT WEIR MANHOLE <br />WSB Project: Emerald Park Splash Pad Irrigation <br />Project Location: City of St. Anthony Village <br />City Project Number: <br />WSB Project Number: 02170-430 <br />Opinion of Probable Cost <br />Total Splash Pad Irrigation Costs <br />6" HPDE SEWER <br />UNDERGROUND STORAGE TANK (62,000 GALLONS) <br />CONNECT TO EXISTING IRRIGATION SYSTEM <br />Subtotal <br />+25% Contingency <br />Subtotal <br />+15% Indirect Costs <br />PUMP & FILTER SYSTEM <br />3" HDPE PIPE SEWER (DIRECTIONALLY DRILLED) <br />EROSION CONTROL <br />ELECTRICAL SERVICE
The URL can be used to link to this page
Your browser does not support the video tag.