My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01312017
StAnthony
>
City Council
>
City Council Work Session
>
2017
>
CC WORKSESSION PACKET 01312017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 9:19:46 AM
Creation date
1/25/2017 9:17:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Please note that using the existing rate structure an 8% increase in rates alternatively would <br />have been recommended. That adjustment would yield an additional quarterly cost of $5.25 to <br />the 15,000 user (approximate median tier use) vs the $6.73 additional quarterly cost proposed. <br />The $1.48 results in an annual difference of $5.94 <br /> <br />See Exhibit F for 2018-2019 modeling of rates based on successive phase-in of flat fee <br />and expected increases in overall costs. <br /> <br />Stormwater rates: <br />The multi-year approach to Stormwater rates in place since 2012 called for an annual <br />increase for single family residential (classifications 2 & 3) of thirty-five cent ($.35) <br />increase. This represents a 2.37% increase in rate and would be expected to generate <br />$4,570 in additional revenues (assuming no new construction). The 2.37% rate increase <br />will be applied to all levels of stormwater charges. The historical impact on a residential <br />single family user is as follows: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />The rate increase for other land use categories is consistent with the increase in single <br />family residential (classifications 2 & 3) as see below: <br /> <br /> <br /> <br /> <br /> <br />Quarterly <br />Bill Usage Rate % Change <br />2011 $13.00 - - <br />2012 $13.35 $0.35 2.69 <br />2013 $13.70 $0.35 2.62 <br />2014 $14.05 $0.35 2.55 <br />2015 $14.40 $0.35 2.49 <br />2016 $14.75 $0.35 2.43 <br />2017 $15.10 $0.35 2.37 <br />Classification-Land Use Proposed 2017 Charge 2016 Charge % Change <br />1-Cemeteries, parks, golf <br />courses, railroads, vacant land <br />$62.65 per acre $61.20 per acre 2.37% <br /> <br />2- R-1, R-1a, and R-2 <br />residential <br />$60.40 per unit $59.00 per unit 2.37% <br />3- R-3 residential $60.40 per unit $59.00 per unit 2.37% <br />4- Schools and institutional <br />uses <br />$144.27 per acre $140.93 per acre 2.37% <br />5- R-4 Residential , churches <br />and manufactured home parks <br />$184.01 per acre $179.75 per acre 2.37% <br />6- Commercial and industrial $229.88 per acre $224.55 per acre 2.37%
The URL can be used to link to this page
Your browser does not support the video tag.