My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 05162017
StAnthony
>
City Council
>
City Council Work Session
>
2017
>
CC WORKSESSION PACKET 05162017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 1:40:22 PM
Creation date
5/11/2017 1:40:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Silver Lake Road Flooding Analysis Results <br />May 03, 2017 <br />Page 3 <br />Model Results <br />Based on the XPSWMM modeling preformed, the following conclusions are made: <br />1. The flooding is a result of the direct drainage area to the low point on Silver Lake Road. <br />2. The existing conditions do not provide adequate inlet capacity to allow the water in the street to enter <br />the storm sewer pipes. <br />3. The existing conditions to not provide adequate storm sewer capacity to allow the water in the <br />streets to enter the storm sewer pipes. <br />Project Cost <br />The total project cost is estimated to cost $624,197. The breakdown of the cost estimate is in Table 1 <br />Table 1 — Cost Estimate <br />Description <br />Units <br />Quantity <br />Unit Price <br />Total Price <br />Mobilization <br />LS <br />1 <br />$30,000.00 <br />$30,000.00 <br />Traffic Control <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />Clearing and Grubbing <br />TREE <br />10 <br />$500.00 <br />$5,000.00 <br />Saw Cutting Bituminous Pavement and Curb <br />LF <br />2,100 <br />$6.00 <br />$12,600.00 <br />Remove Bituminous Pavement <br />SY <br />2,955 <br />$8.00 <br />$23,640.00 <br />Remove Curb Median <br />SY <br />545 <br />$10.00 <br />$5,450.00 <br />Replace Bituminous Pavement <br />SY <br />2,966 <br />$40.00 <br />$118,640.00 <br />Replace Curb Median <br />SY <br />545 <br />$65.00 <br />$35,425.00 <br />Remove and Replace Skimmer <br />EACH <br />1 <br />$8,000.00 <br />$8,000.00 <br />Remove Sediment at Existing Outlet <br />LS <br />1 <br />$25,000.00 <br />$25,000.00 <br />Remove Existing MH <br />EACH <br />6 <br />$1,500.00 <br />$9,000.00 <br />Remove TCA's 24" Force Main <br />LF <br />1,050 <br />$5.00 <br />$5,250.00 <br />36" RC Pipe Sewer <br />LF <br />1,050 <br />$80.00 <br />$84,000.00 <br />36" RC Head Wall Through Retaining Wall <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />Random Riprap Class V (Field Stone) <br />CY <br />70 <br />$175.00 <br />$12,250.00 <br />Connect to Existing Structure /Pipe <br />EACH <br />3 <br />$1,000.00 <br />$3,000.00 <br />CB's and Structures <br />EACH <br />8 <br />$4,200.00 <br />$33,600.00 <br />Construct Drainage Structure Design 4020 -60 <br />LF <br />10 <br />$400.00 <br />$4,000.00 <br />Construct Drainage Structure Design 4020 -84 <br />LF <br />10 <br />$500.00 <br />$5,000.00 <br />Erosion Control <br />LS <br />1 <br />$3,000.00 <br />$3,000.00 <br />Project Restoration <br />LS <br />1 <br />$3,000.00 <br />$3,000.00 <br />Total Construction Cost <br />$445,855.00 <br />15% Engineering Fees <br />$66,878.25 <br />25% Contingency <br />$111,463.75 <br />Total Project Cost <br />$624,197.00 <br />M'. \031]0 >]D \Ptlmin \Daz \031]DilO SIIveM1aYePGF,00tlmgPewltzMemo 301IL5 -03.tlov <br />
The URL can be used to link to this page
Your browser does not support the video tag.