My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08222017
StAnthony
>
City Council
>
City Council Packets
>
2017
>
CC PACKET 08222017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2017 9:57:40 AM
Creation date
8/22/2017 1:31:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2018 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 010507-000 PAGE 1 <br />1. EXECUTIVE SUMMARY <br />The 2018 Street and Utility Improvement Project consists of the reconstruction of <br />approximately 2,700 feet of 30-foot urban section streets complete with bituminous <br />paving and concrete curb and gutter along the following roadways: <br /> <br />• Macalaster Drive NE from 37th Avenue NE to the railroad tracks <br />• Foss Road from 37th Avenue NE to Chandler Drive NE <br />• Highcrest Road NE from 37th Avenue NE to the terminate end <br /> <br />The proposed utility improvements include the removal and replacement of <br />approximately 2,700 feet of water main and approximately 2,500 feet of sanitary sewer <br />main, the extension of new storm sewer where facilities do not currently exist and <br />installation of additional catch basins to improve area drainage. <br /> <br />Also proposed for improvement in 2018 is the bituminous mill and overlay of Anthony <br />Lane County Road C to the cul-de-sac and a water reuse retrofit to the Central Park <br />splash pad. <br /> <br />A map illustrating the project location can be found on Figure 1 of Appendix A. <br /> <br />The total estimated project cost for the 2018 Street and Utility Improvement Project is <br />approximately $2.74 million. Funding for the project will come from the City’s Street <br />and Utility Reconstruction Funds (Public Improvement Bonds) and Special Assessments <br />to benefiting properties. <br /> <br />The project reconstruction can be completed, including the first lift of bituminous paving <br />and all restoration items, in 2018. The final lift of bituminous paving is proposed to be <br />installed in June of 2019. <br /> <br />This project is feasible, necessary, and cost effective from an engineering standpoint and <br />should be constructed as proposed herein. <br /> <br />27
The URL can be used to link to this page
Your browser does not support the video tag.