<br /> <br />2018 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 010507-000 PAGE 8 <br />4.7 Detour Routes <br /> <br />The project will require significant excavation and disposal of unacceptable material <br />from the existing street area and a supply of significant volumes of select granular base, <br />aggregate base, and bituminous pavement materials. This effort will require closing the <br />roads under construction and increasing loaded truck traffic on the streets adjacent to the <br />construction area. Adequately signed detours will be identified to direct traffic around the <br />construction zones and notify users of the increased truck and construction activity. In <br />order to accommodate the property owners along the excavated roads, temporary parking <br />on the adjacent streets may be necessary during the periods when vehicle access is not <br />possible. <br />34