My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08222017
StAnthony
>
City Council
>
City Council Packets
>
2017
>
CC PACKET 08222017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2017 9:57:40 AM
Creation date
8/22/2017 1:31:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2018 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 010507-000 PAGE 8 <br />4.7 Detour Routes <br /> <br />The project will require significant excavation and disposal of unacceptable material <br />from the existing street area and a supply of significant volumes of select granular base, <br />aggregate base, and bituminous pavement materials. This effort will require closing the <br />roads under construction and increasing loaded truck traffic on the streets adjacent to the <br />construction area. Adequately signed detours will be identified to direct traffic around the <br />construction zones and notify users of the increased truck and construction activity. In <br />order to accommodate the property owners along the excavated roads, temporary parking <br />on the adjacent streets may be necessary during the periods when vehicle access is not <br />possible. <br />34
The URL can be used to link to this page
Your browser does not support the video tag.