My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08222017
StAnthony
>
City Council
>
City Council Packets
>
2017
>
CC PACKET 08222017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2017 9:57:40 AM
Creation date
8/22/2017 1:31:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2018 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 010507-000 PAGE 12 <br />7. FEASIBILITY AND RECOMMENDATION <br />Project costs are anticipated to be approximately $2.74 million. <br /> <br />Due to the poor structural condition of portions of the street sections, the deterioration of <br />the existing sanitary sewer system and frequent water main breaks, this project is both <br />feasible and necessary from an engineering standpoint. <br /> <br />Based on our analysis and data presented, the proposed project is feasible, necessary, and <br />cost effective from an engineering standpoint. We recommend reconstruction of the <br />sanitary sewer, water main, stormwater collection system, and the street as detailed in this <br />report. <br />38
The URL can be used to link to this page
Your browser does not support the video tag.