My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC MINUTES 09122017
StAnthony
>
City Council
>
City Council Minutes
>
2017
>
CC MINUTES 09122017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2017 9:40:09 AM
Creation date
9/27/2017 9:40:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br />September 12, 2017 <br />Page 4 <br />There were no requests for public input. <br />Mayor Faust closed the public hearing at 7:40 p.m. <br />5 Motion by Councilmember Stille, seconded by Councilmember Jenson, to adopt Resolution 17- <br />6 062; a Resolution Setting the Proposed 2018 Tax Levy and General Operating Budget for the <br />7 City of St. Anthony Village. <br />8 <br />9 Motion carried 3 -0. <br />10 <br />11 B. Mirror Lake Temporary Drawdown. <br />12 <br />13 Mayor Faust opened the public hearing at 7:41 p.m. <br />14 <br />15 City Engineer Todd Hubmer stated due to the warm weather last winter, the Contractor was <br />16 unable to finish the lake excavation. Therefore, the lake excavation will be completed this <br />17 winter. The procedure will be similar to last year. He provided the status of the work completed <br />18 and the work to be completed. The anticipated construction schedule was reviewed. The details <br />19 of the Mirror Lake Partnership Structure of the Cooperative Agreement were provided. <br />20 <br />21 Councilmember Jenson asked where the water goes during the temporary draw down. Mr. <br />22 Hubmer stated the outlet is at the very bottom of the lake. The outlet is opened up and the water <br />23 is drained down. Some areas may need to be pumped and the piping from the system will be <br />24 reduced as to not send as much water downstream. The water will now be contained in Mirror <br />25 Lake. <br />26 <br />27 Councilmember Stille asked if the winter is similar to last year, will it be completed this year. <br />28 Mr. Hubmer stated there are only two weeks of excavation work to be done. <br />29 <br />30 Mayor Faust asked if a meeting has been held with the residents. Mr. Hubmer stated no meeting <br />31 was held but communication is done through the City's website and an individual mailing was <br />32 sent. Mayor Faust stated in 1998 they were discussing 100 -year floods and now Atlas 14 is being <br />33 used and creates a 30% increase in storm water handling. <br />34 <br />35 Mayor Faust closed the public hearing at 7:47 p.m. <br />36 <br />37 V. REPORTS FROM COMMISSION AND STAFF - NONE <br />38 <br />39 VI. GENERAL BUSINESS OF COUNCIL. <br />40 <br />41 A. City Council Vacancy Replacement Options <br />42 <br />43 City Manager Casey reviewed on August 18, 2017, Councilmember Bonnie Brever submitted a <br />44 letter of resignation to the City Manager. On August 22, 2017, the Council adopted Resolution <br />45 17 -061 accepting the resignation and declaring a vacancy. Since the vacancy occurred after the <br />46 first day to file affidavits of candidacy an election for a replacement Councilmember may not be <br />
The URL can be used to link to this page
Your browser does not support the video tag.