Laserfiche WebLink
Hydrodynamic Separator <br />Pros Cons <br />Total Suspended Solids No Grant Funding <br />Removal No Dissolved Phosphorus <br />TP Removal: 5.4 lbs Removal <br />Anticipated to achieve 17% of Will not improve Salo Pond <br />TMDL 'P° reduction goal to SL Aesthetics <br />Simple Operation <br />O & M Costs $4 - $6k /yr <br />Other Considerations <br />Should Silver Lake not meet TMDL goals, Salo system <br />may be need to be considered in future <br />Salo grant funds may not be available in the future <br />Funding and RCWD Credits <br />Salo Ponds Hydrodynamic <br />Separator <br />*MPCA TMDL grant is fora 50% match up to 8500,000 or 50%of the <br />as -bid project cost, whichever is the lesser of the two. <br />-Annual street reconstruction ranges from about 2500 to 3000 If <br />