My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION 04152013
StAnthony
>
City Council
>
City Council Work Session
>
2013
>
CC WORKSESSION 04152013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2017 10:43:58 AM
Creation date
11/3/2017 10:43:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hydrodynamic Separator <br />Pros Cons <br />Total Suspended Solids No Grant Funding <br />Removal No Dissolved Phosphorus <br />TP Removal: 5.4 lbs Removal <br />Anticipated to achieve 17% of Will not improve Salo Pond <br />TMDL 'P° reduction goal to SL Aesthetics <br />Simple Operation <br />O & M Costs $4 - $6k /yr <br />Other Considerations <br />Should Silver Lake not meet TMDL goals, Salo system <br />may be need to be considered in future <br />Salo grant funds may not be available in the future <br />Funding and RCWD Credits <br />Salo Ponds Hydrodynamic <br />Separator <br />*MPCA TMDL grant is fora 50% match up to 8500,000 or 50%of the <br />as -bid project cost, whichever is the lesser of the two. <br />-Annual street reconstruction ranges from about 2500 to 3000 If <br />
The URL can be used to link to this page
Your browser does not support the video tag.