My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01302018
StAnthony
>
City Council
>
City Council Work Session
>
2018
>
CC WORKSESSION PACKET 01302018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2018 12:35:19 PM
Creation date
1/22/2018 12:31:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />101 <br /> <br />extend from the southwest corner of the City, and include one corridor running <br />north-south on the western edge of the City (centered on Stinson Boulevard <br />north of St. Anthony Boulevard), one running in a southwest/northeast direction <br />(centered on Silver Lake Road, 29th Avenue, and Old Highway 8). There is also <br />a corridor running to the east from St. Anthony Village centered on the existing <br />Northeast Diagonal Trail; however, because that trail already exists, an alignment <br />does not need to be identified for the segment within the St. Anthony Village. <br />The RBTN alignment identified along St. Anthony Boulevard, along with the <br />remaining portion of St. Anthony Boulevard south of the Northeast Diagonal Trail, <br />is also identified in the Hennepin County 2040 Bicycle Transportation Plan as <br />part of the planned off-street bikeway system. The Minneapolis Park & <br />Recreation Board has also identified this corridor for a regional trail as part of the <br />Grand Rounds Missing Link project, a project to develop connections to the <br />existing Grand Rounds trail system. The Hennepin County plan also identifies <br />Stinson Boulevard as part of the planned on-street bikeway system. <br />Hennepin County has a planned reconstruction project on 29th Avenue which will <br />add sidewalk to CSAH 94 (29th Avenue) between CSAH 88 and the county line. <br />This project also includes participation from the City and Ramsey County. <br />The Ramsey County-Wide Pedestrian & Bicycle Plan identifies a Connected <br />Ramsey Communities Network, with a series of corridors that represent long- <br />distance bikeways crossing the county. Within St. Anthony Village, there are <br />three of these corridors: County Road D (37th Avenue), Stinson (Stinson <br />Boulevard), and Silver Lake Road. County Road E (45th Avenue) is shown as a <br />planned Local Corridor, while Silver Lane is identified as a Local Corridor with an <br />identified need. <br />The City proposes the following alignments for the RBTN corridors identified <br />within the City: <br />• Along Stinson Boulevard between St. Anthony Boulevard and Silver Lane <br />(coordination with City of Minneapolis needed). <br />• Along New Brighton Boulevard (CSAH 88) and Old Highway 8. <br />The existing and proposed regional network is shown in FIGURE 6-15. <br />
The URL can be used to link to this page
Your browser does not support the video tag.