My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01302018
StAnthony
>
City Council
>
City Council Work Session
>
2018
>
CC WORKSESSION PACKET 01302018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2018 12:35:19 PM
Creation date
1/22/2018 12:31:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
St. Anthony 2040 Comprehensive Plan Chapter 8: Water Supply <br />155 <br /> <br />Growth and Demand Projections <br />The Metropolitan Council projects that the City of St. Anthony will grow <br />slightly over the lifetime of this Plan, and that its total per capita water use <br />will remain constant. The population served by the City of St. Anthony’s <br />water distribution system is expected to increase to 8,800 people by the <br />year 2040, at which time the projected total per capita water use of 109 <br />gallons per capita per day will result in an average day demand of 0.96 <br />million gallons per day and a maximum day demand of 2.01 million <br />gallons per day. <br />Proposed Improvements <br />Most of the system improvements required to sustain the City’s future <br />water demands involve the upkeep of existing infrastructure. As detailed <br />in the following sections, these include the installation of SCADA systems <br />at the production wells and water treatment plant, the maintenance and <br />restoration of the well pumps, and the repair and maintenance of the <br />ground storage tank and water tower.
The URL can be used to link to this page
Your browser does not support the video tag.