Laserfiche WebLink
Local Water Supply Plan Template –December 8, 2015 <br /> <br />20 <br /> <br />System Component Planned action Anticipated <br />Construction <br />Year <br />Notes <br /> Wells/Intakes  No action planned - adequate <br /> Repair/replacement <br /> Expansion/addition <br /> -HSP upgrades & <br />piping <br />-well casing <br />-well pump <br />restoration <br />-wellhouse <br />generators <br />Water Storage Facilities <br /> <br /> No action planned - adequate <br /> Repair/replacement <br /> Expansion/addition <br />2016 - 2017 - Ground storage <br />reservoir <br />-repaint water <br />tower <br /> <br />Water Treatment Facilities  No action planned - adequate <br /> Repair/replacement <br /> Expansion/addition <br />2016 - 2017 To address 1,4- <br />dioxane in the <br />water as a result of <br />the Twin Cities <br />Army Ammunition <br />Plant, the City is <br />expanding to its <br />water treatment <br />plant with an <br />advanced oxidation <br />process that will <br />remove 1,4- <br />dioxane. <br />Distribution Systems (pipes, valves, <br />etc.) <br /> No action planned - adequate <br /> Repair/replacement <br /> Expansion/addition <br />2016-2032 <br /> <br />-watermain <br />replacement <br />Pressure Zones  No action planned - adequate <br /> Repair/replacement <br /> Expansion/addition <br /> <br />Other: SCADA  No action planned - adequate <br /> Repair/replacement <br /> Expansion/addition <br /> -SCADA System <br />upgrade <br />Proposed Future Water Sources <br />Complete Table 13 to identify new water source installation planned over the next ten years. Add rows <br />to the table as needed. <br />Table 13. Proposed future installations/sources <br />Source Installation <br />Location <br />(approximate) <br />Resource <br />Name <br />Proposed <br />Pumping <br />Capacity (gpm) <br /> Planned <br />Installation Year <br />Planned <br />Partnerships <br />Groundwater N/A <br />Surface Water N/A <br />Interconnection <br />to another <br />N/A