Laserfiche WebLink
SECTION VI <br />2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Comments <br />10 Year <br />Cost <br />Estimate1 <br />Possible <br />Funding Sources 3 <br />Proposed Cost By Year1,2 <br />No.Project Description <br />5 <br />IDDE Plan - Develop and implement an illicit discharge <br />detection plan, consisting of staff training and <br />procedures for inspections and corrective actions. <br />$5,000 Stormwater Utility <br />Fund $500 $500 $500 $500 $500 $500 $500 $500 $500 $500 See SWPPP Application for <br />Reauthorization (Appendix B) <br />6 <br />Storm Sewer System Map - The City currently has a <br />storm sewer system map. This map will be updated on <br />an annual basis. <br />$1,500 Stormwater Utility <br />Fund $150 $150 $150 $150 $150 $150 $150 $150 $150 $150 See SWPPP Application for <br />Reauthorization (Appendix B) <br />7 <br />Regulatory Control Program - Review existing city <br />ordinances (Sections 400 & 1200) relating to illicit <br />discharges, and revise/develop an illicit discharge <br />ordinance (if necessary). Code of Ordinances: Chapter <br />153, Storm Water Management <br />- The City established an Illicit Discharge and <br />Connection Ordinance in 2009. This ordinance will be <br />evaluated annually and updated as necessary. <br />$4,000 Stormwater Utility <br />Fund $2,000 $2,000 See SWPPP Application for <br />Reauthorization (Appendix B) <br />8 <br />Public and Employee Illicit Discharge Information <br />Program - Public education of illicit discharges. Provide <br />a minimum of one training event for city staff per year.$2,000 Stormwater Utility <br />Fund $200 $200 $200 $200 $200 $200 $200 $200 $200 $200 See SWPPP Application for <br />Reauthorization (Appendix B) <br />9 <br />Illicit Discharge Investigation - As needed televise a <br />section of the sewer system, collect grab samples, or <br />perform other testing procedures to find illicit <br />connections in the system. <br />$5,000 Stormwater Utility <br />Fund $500 $500 $500 $500 $500 $500 $500 $500 $500 $500 See SWPPP Application for <br />Reauthorization (Appendix B) <br />10 <br />IDDE Program Updates - Update written procedures for <br />illicit discharge inspections, investigations, and response <br />actions. Develop a process to document information as <br />described in the Permit (Part III.3.h) within 12 months <br />following the date permit coverage is extended. <br />$2,000 Stormwater Utility <br />Fund $2,000 See SWPPP Application for <br />Reauthorization (Appendix B) <br />11 <br />Ordinance or other Regulatory Mechanism - Review <br />existing construction site erosion control ordinances, <br />and revise if they do not conform to the new NPDES <br />Phase II construction permit requirements. <br />$4,000 Stormwater Utility <br />Fund $2,000 $2,000 See SWPPP Application for <br />Reauthorization (Appendix B) <br />12 <br />Construction Site Implementation of Erosion and <br />Sediment Control BMPs: Waste Controls for <br />Construction Site Operators - Construction site <br />operators must conform to NPDES Phase II, watershed <br />district, and City ordinances pertaining to erosion, <br />sediment, and waste controls. <br />$1,000 Stormwater Utility <br />Fund $500 $500 See SWPPP Application for <br />Reauthorization (Appendix B) <br />City of St Anthony <br />WSB Project No. 1626-670 <br />December 2017 <br />TABLE 6.1