SECTION VI
<br />2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Comments
<br />10 Year
<br />Cost
<br />Estimate1
<br />Possible
<br />Funding Sources 3
<br />Proposed Cost By Year1,2
<br />No.Project Description
<br />22
<br />Street Sweeping Program - Sweep streets five times
<br />annually. Record the annual number of times streets are
<br />brush swept as well as document any additional
<br />activities that were undertaken regarding this program.$450,000 Public Works $45,000 $45,000 $45,000 $45,000 $45,000 $45,000 $45,000 $45,000 $45,000 $45,000 See SWPPP Application for
<br />Reauthorization (Appendix B)
<br />23
<br />Annual Inspection of All Structural Stormwater BMPs
<br />Inspect and document maintenance needs on all
<br />structural stormwater BMPs.$10,000 Stormwater Utility
<br />Fund $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 See SWPPP Application for
<br />Reauthorization (Appendix B)
<br />24
<br />Inspection of a Minimum of 20% of the MS4 Outfalls,
<br />Sediment Basins and Ponds Each Year on a Rotating
<br />Basis. - The City will inspect all mapped outfalls,
<br />sediment basins, and ponds, with a minimum of 20%
<br />each year (on a rotating schedule during permit
<br />coverage) and record the number inspected and rate the
<br />condition of each outfall.
<br />$10,000 Stormwater Utility
<br />Fund $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 See SWPPP Application for
<br />Reauthorization (Appendix B)
<br />25
<br />Inspection of All Exposed Stockpile, Storage, and
<br />Material Handling Areas - Locate and inspect all
<br />exposed stockpile, storage and material handling areas
<br />located on City-owned properties. Record inspections
<br />and correct and document all remedial actions quarterly.
<br />$10,000 Stormwater Utility
<br />Fund $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 See SWPPP Application for
<br />Reauthorization (Appendix B)
<br />26
<br />Inspection Follow-up, Including the Determination of
<br />Whether Repair, Replacement, or Maintenance
<br />Measures are Necessary and the Implementation of
<br />the Corrective Measures - The City will determine
<br />whether repair, replacement, or maintenance measures
<br />are necessary from evaluating inspections records and
<br />other pertinent information. All corrective maintenance,
<br />repair, and/or replacement measures will be recorded.
<br />$5,000 Stormwater Utility
<br />Fund $500 $500 $500 $500 $500 $500 $500 $500 $500 $500 See SWPPP Application for
<br />Reauthorization (Appendix B)
<br />27
<br />Record Reporting and Retention of All Inspections and
<br />Responses to the Inspections - The City will retain all
<br />records of inspection, maintenance, and
<br />corrective actions for a minimum of three years past the
<br />expiration of the MS4 permit.
<br />$5,000 Stormwater Utility
<br />Fund $500 $500 $500 $500 $500 $500 $500 $500 $500 $500 See SWPPP Application for
<br />Reauthorization (Appendix B)
<br />28 Evaluation of Inspection Frequency - Continue to
<br />implement annually.$2,000 Stormwater Utility
<br />Fund $200 $200 $200 $200 $200 $200 $200 $200 $200 $200 See SWPPP Application for
<br />Reauthorization (Appendix B)
<br />29
<br />Landscaping & Lawn Care Practices Review - Continue
<br />to evaluate current practices of fertilizer, pesticide, and
<br />herbicide application, mowing operations, grass clipping
<br />collection, mulching, and composting.
<br />$5,000 Stormwater Utility
<br />Fund $500 $500 $500 $500 $500 $500 $500 $500 $500 $500 See SWPPP Application for
<br />Reauthorization (Appendix B)
<br />City of St Anthony
<br />WSB Project No. 1626-670
<br />December 2017
<br />TABLE 6.1
|