Laserfiche WebLink
SECTION VI <br />2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Comments <br />10 Year <br />Cost <br />Estimate1 <br />Possible <br />Funding Sources 3 <br />Proposed Cost By Year1,2 <br />No.Project Description <br />22 <br />Street Sweeping Program - Sweep streets five times <br />annually. Record the annual number of times streets are <br />brush swept as well as document any additional <br />activities that were undertaken regarding this program.$450,000 Public Works $45,000 $45,000 $45,000 $45,000 $45,000 $45,000 $45,000 $45,000 $45,000 $45,000 See SWPPP Application for <br />Reauthorization (Appendix B) <br />23 <br />Annual Inspection of All Structural Stormwater BMPs <br />Inspect and document maintenance needs on all <br />structural stormwater BMPs.$10,000 Stormwater Utility <br />Fund $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 See SWPPP Application for <br />Reauthorization (Appendix B) <br />24 <br />Inspection of a Minimum of 20% of the MS4 Outfalls, <br />Sediment Basins and Ponds Each Year on a Rotating <br />Basis. - The City will inspect all mapped outfalls, <br />sediment basins, and ponds, with a minimum of 20% <br />each year (on a rotating schedule during permit <br />coverage) and record the number inspected and rate the <br />condition of each outfall. <br />$10,000 Stormwater Utility <br />Fund $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 See SWPPP Application for <br />Reauthorization (Appendix B) <br />25 <br />Inspection of All Exposed Stockpile, Storage, and <br />Material Handling Areas - Locate and inspect all <br />exposed stockpile, storage and material handling areas <br />located on City-owned properties. Record inspections <br />and correct and document all remedial actions quarterly. <br />$10,000 Stormwater Utility <br />Fund $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 See SWPPP Application for <br />Reauthorization (Appendix B) <br />26 <br />Inspection Follow-up, Including the Determination of <br />Whether Repair, Replacement, or Maintenance <br />Measures are Necessary and the Implementation of <br />the Corrective Measures - The City will determine <br />whether repair, replacement, or maintenance measures <br />are necessary from evaluating inspections records and <br />other pertinent information. All corrective maintenance, <br />repair, and/or replacement measures will be recorded. <br />$5,000 Stormwater Utility <br />Fund $500 $500 $500 $500 $500 $500 $500 $500 $500 $500 See SWPPP Application for <br />Reauthorization (Appendix B) <br />27 <br />Record Reporting and Retention of All Inspections and <br />Responses to the Inspections - The City will retain all <br />records of inspection, maintenance, and <br />corrective actions for a minimum of three years past the <br />expiration of the MS4 permit. <br />$5,000 Stormwater Utility <br />Fund $500 $500 $500 $500 $500 $500 $500 $500 $500 $500 See SWPPP Application for <br />Reauthorization (Appendix B) <br />28 Evaluation of Inspection Frequency - Continue to <br />implement annually.$2,000 Stormwater Utility <br />Fund $200 $200 $200 $200 $200 $200 $200 $200 $200 $200 See SWPPP Application for <br />Reauthorization (Appendix B) <br />29 <br />Landscaping & Lawn Care Practices Review - Continue <br />to evaluate current practices of fertilizer, pesticide, and <br />herbicide application, mowing operations, grass clipping <br />collection, mulching, and composting. <br />$5,000 Stormwater Utility <br />Fund $500 $500 $500 $500 $500 $500 $500 $500 $500 $500 See SWPPP Application for <br />Reauthorization (Appendix B) <br />City of St Anthony <br />WSB Project No. 1626-670 <br />December 2017 <br />TABLE 6.1