My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01302018
StAnthony
>
City Council
>
City Council Work Session
>
2018
>
CC WORKSESSION PACKET 01302018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2018 12:35:19 PM
Creation date
1/22/2018 12:31:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RCWD Alternative Compliance Sequencing Report <br />City of St. Anthony Village PAGE 18 <br />WSB Project No. 1626-53 <br />goals can be achieved. In addition, BMPs that are able to target TP loads typically <br />achieve much higher removal efficiencies for TSS. For these reasons, TP is the <br />primary pollutant load targeted to address the RCWD’s water quality standards. <br /> <br />D. Required Volume & Equivalent Pollutant Reduction for Future Projects <br />In addition to the calculation of city-wide requirements provided, the specific <br />requirements for future street and utility reconstruction projects is estimated to help <br />plan future BMP construction and to demonstrate compliance with RCWD water <br />quality standards over the upcoming years. <br /> <br />Using the methods outlined above, the required volume reduction, and associated <br />equivalent pollutant reduction has been calculated for anticipated linear <br />reconstruction projects outlined in the City’s Capital Improvement Plan. See <br />Figure 1 for a map of the project. A list of the project year, the receiving water, <br />and linear footage estimates for the projects are presented in Table 3 below. <br /> <br />Table 3: Linear Footage of Future Projects by Watershed <br />Project <br />Year <br />Project Streets <br />(See Figure 1 for <br />Exact Locations) <br />Linear Footage to Receiving Watershed <br />Silver <br />Lake <br />Ramsey <br />County <br />Ditch 2 <br />Within <br />RCWD, <br />draining <br />to Miss <br />River <br />Outside of <br />RCWD <br />2012 Belden, Coolidge & 35th 880 340 2,250 <br />2013 Edward & 36th 2,000 650 <br />2014 Penrod, Edgemere & <br />Wendhurst 3,320 <br />2015 Chelmsford & 36th 3,460 <br />2016 Penrod, Chelmsford & <br />Skycroft 1,820 <br />2017 Rankin, Skycroft, Croft & <br />32nd 3,330 <br />2018 Penrod & MacAlaster 3,560 <br />2019 Shamrock, Fordham & <br />Foss 2,580 <br />2020 Skycroft, Downers & <br />Maplewood 3,330 <br />2021 Skycroft Cir, Croft & 34th 3,100 <br />2022 Rankin, Townview & 31st 920 610 2,850 <br />2023 Anthony Ln 3,740 <br />2024 Silver Ln 3,360 <br /> <br />Although this reflects the current street reconstruction plan approved by the City, <br />the order of, and magnitude of street reconstruction projects are periodically <br />adjusted based on the current needs of the City.
The URL can be used to link to this page
Your browser does not support the video tag.