My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01302018
StAnthony
>
City Council
>
City Council Work Session
>
2018
>
CC WORKSESSION PACKET 01302018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2018 12:35:19 PM
Creation date
1/22/2018 12:31:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITES INFRASTRUCTURE <br />PLANT, PRODUCTION,STORAGE, WASTE AND FIBER SYSTEM <br />00 0 <br />DEPT PURPOSE DESCRIPTION 2018 2019 2020 <br />Plant Facilities <br />AOP Plant <br />Plant Construction (1)25,000 ‐ ‐ <br />Plant SCADA system (2) ‐ ‐ ‐ <br />GAC / Iron plants (moved from Buildings CIP in 2017)‐ ‐ ‐ <br />Metal Door Frame & Replacement ‐ ‐ ‐ <br />Security upgrades ‐Cameras ‐ ‐ ‐ <br />Security upgrades ‐ Entrance controls / Fiber ‐ ‐ ‐ <br />Reznor Heating Units ‐ 18,900 ‐ <br />Dehumidifier ‐ ‐ ‐ <br />Domestic Water Heaters ‐ ‐ ‐ <br />Dehumidifier ‐ ‐ ‐ <br />Boiler ‐ ‐ ‐ <br />Relamp & Reballast ‐ ‐ ‐ <br />Flow meters‐ GAC & Iron ‐ ‐ ‐ <br />Chorine booster pump ‐GAC ‐ ‐ ‐ <br />GAC Roof 2016 / Iron plant roof 2026 ‐ ‐ ‐ <br />Production <br />Carbon Media (now funded directly by water rates) ‐ ‐ ‐ <br />High Service Pump Upgrades and Piping (1,2, 3 & 4) ‐ ‐ ‐ <br />Cla Valve Replacement (Replacement by 2040) ‐ ‐ ‐ <br />Well No. 3 Well casing ‐ ‐ ‐ <br />Well No. 3 Pump restoration ‐ ‐ ‐ <br />Well No. 4 Pump restoration ‐ ‐ ‐ <br />Well No. 5 Pump restoration 75,000 ‐ ‐ <br />Retro fit Well No. 5 for mobile Generator 7,500 ‐ ‐ <br />Add permanent generator Well No. 4 ‐ ‐ ‐ <br />Storage <br />Ground Storage and Tower Cleaning & Inspection ‐ ‐ ‐ <br />Tower Painting (last painted in 2000) ‐ ‐ ‐ <br />Distribution System <br />Watermains (Included in streets reconstruction) ‐ ‐ ‐ <br />Meter reading software upgrade ‐ ‐ ‐ <br />Mandates <br />Wellhead Protection Plan Documentation (MDHS) ‐ ‐ 25,000 <br />Update Water System Plan ‐ ‐ ‐ <br />Wellhead Protection Plan Components: ‐ ‐ ‐ <br />Education/Public Awareness 1,000 1,000 1,000 <br />Update Inventory of Potential Contamination Sources 1,000 1,000 1,000 <br />Annual Well Sampling 500 500 500 <br />185,000 21,400 27,500 <br />Lift Stations <br />Lift Stations ‐ SCADA system 40,000 ‐ ‐ <br />Foss Road Lift Station Pump Replacement/re‐hab ‐ 15,000 ‐ <br />Harding Lift Station Pump Replacement/re‐hab ‐ ‐ ‐ <br />Collection System <br />Collection System (Included in streets reconstruction) ‐ ‐ ‐ <br />40,000 15,000 ‐ <br />Backbone <br />Fiber to well houses and lift stations 100,000 ‐ ‐ <br />Network switch City Hall ‐ ‐ ‐ <br />100,000 ‐ ‐ <br />TOTAL PUBLIC UTILITES INFRASTRUTURE PLAN 325,000$ 36,400$ 27,500$ <br />WATER UTILITY <br />SEWER UTILITY <br />FIBER LAN UTILITY
The URL can be used to link to this page
Your browser does not support the video tag.