Laserfiche WebLink
St. Anthony 2040 Comprehensive Plan Chapter 6: Transportation <br /> <br />85 <br /> <br />installation of any mitigation measures recommended by a Traffic Impact <br />Study. <br />• The County Engineer may require dedication of access control over the <br />remainder of a parcel as a condition of granting access in a particular <br />location. <br /> <br />It should be noted that there are existing access points within the City that do not <br />meet Hennepin County access spacing guidelines or are inconsistent with <br />Ramsey County’s draft access management policies. In many cases these <br />access points were established prior to agency access spacing <br />guidelines/policies. In other cases the agency has granted an exception to the <br />existing guidelines. As roadways are reconstructed and as development or <br />redevelopment occurs, each of these agencies generally works to modify and/or <br />relocate access points that do not meet current access spacing guidelines, <br />recognizing that this may not be feasible in all instances. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />