My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 02262018
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2018
>
PL PACKET 02262018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 8:40:08 AM
Creation date
2/20/2018 3:22:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
178 East 9th Street, Suite 200 | St. Paul, MN 55101 | (651) 286-8450 <br /> <br /> <br />Building a legacy – your legacy. <br />Equal Opportunity Employer | wsbeng.com <br />S:\1Planning Commission\2018\02262018\Village Development - Plan Review - 021318-engineer.docx <br /> <br />February 13, 2018 <br /> <br /> <br /> <br />Ms. Traci Tomas <br />Continental Property Group <br /> <br />Re: The Village LLC Development <br /> St. Anthony Village, MN <br /> Preliminary PUD Plan Review <br />WSB Project No. 02170-300 <br /> <br />Dear Ms. Tomas: <br /> <br />We have reviewed the development plan submittal received on January 29, 2018, for the above <br />referenced project. Plans have been prepared by Wenck Associates, dated January 26, 2017 and <br />include the storm water management plan, preliminary plat, site plan, grading plan, sanitary sewer, water, <br />and storm utility plans. <br /> <br />We have the following comments and recommendations for this preliminary PUD Plan review. <br /> <br />General <br /> <br />1. Prior to the start of any construction, permits will need to be obtained and submitted to the city <br />from the following agencies: <br />a. MPCA Construction General Permit <br />b. MPCA Sanitary Sewer Extension Permit <br />c. MnDOH Watermain Extension Permit <br /> <br />2. Prior to the start of any construction, project approval will need to be obtained and submitted to <br />the city from the following agencies: <br />a. Hennepin County (access and traffic control associated with Kenzie Terrace/ CR 153) <br />b. Minneapolis Park Board (access and traffic control associated with Stinson Parkway) <br /> <br />3. An operations and maintenance component will be required to ensure that the stormwater <br />treatment facilities will be maintained long term. The declarations must at a minimum include the <br />following: <br />a. Annual inspection and reporting to the city <br />b. Maintenance of all erosion control measures including, but not limited to: rip rap, storm <br />sewer outlets, catch basin inlets, etc. (annual documentation required) <br />c. Verification of system drawdowns with 48 hours (annual documentation required) <br />d. Removal of sediment, trash and debris (annual documentation required) <br /> <br /> <br />Cover Sheet and Project Notes <br /> <br />1. Reference the most recent edition (2018) of the City of St. Anthony’s General Specifications and <br />Standard Detail Plates for Street and Utility Construction as a governing specification. <br /> <br /> <br />Preliminary Plat <br /> <br />1. Remove the erroneous line within the 15’ drainage and utility easement along Kenzie Terrace.
The URL can be used to link to this page
Your browser does not support the video tag.