Laserfiche WebLink
                                                                                           178 East 9th Street, Suite 200 | St. Paul, MN 55101 | (651) 286-8450 <br />  <br />  <br />Building a legacy – your legacy. <br />Equal Opportunity Employer | wsbeng.com  <br />S:\1Planning Commission\2018\02262018\Village Development - Plan Review - 021318-engineer.docx <br /> <br />February 13, 2018 <br /> <br /> <br /> <br />Ms. Traci Tomas <br />Continental Property Group <br /> <br />Re: The Village LLC Development <br /> St. Anthony Village, MN <br /> Preliminary PUD Plan Review <br />WSB Project No. 02170-300 <br /> <br />Dear Ms. Tomas: <br /> <br />We have reviewed the development plan submittal received on January 29, 2018, for the above <br />referenced project. Plans have been prepared by Wenck Associates, dated January 26, 2017 and <br />include the storm water management plan, preliminary plat, site plan, grading plan, sanitary sewer, water, <br />and storm utility plans. <br /> <br />We have the following comments and recommendations for this preliminary PUD Plan review. <br /> <br />General <br /> <br />1. Prior to the start of any construction, permits will need to be obtained and submitted to the city <br />from the following agencies: <br />a. MPCA Construction General Permit <br />b. MPCA Sanitary Sewer Extension Permit <br />c. MnDOH Watermain Extension Permit <br /> <br />2. Prior to the start of any construction, project approval will need to be obtained and submitted to <br />the city from the following agencies: <br />a. Hennepin County (access and traffic control associated with Kenzie Terrace/ CR 153) <br />b. Minneapolis Park Board (access and traffic control associated with Stinson Parkway) <br /> <br />3. An operations and maintenance component will be required to ensure that the stormwater <br />treatment facilities will be maintained long term. The declarations must at a minimum include the <br />following: <br />a. Annual inspection and reporting to the city <br />b. Maintenance of all erosion control measures including, but not limited to: rip rap, storm <br />sewer outlets, catch basin inlets, etc. (annual documentation required) <br />c. Verification of system drawdowns with 48 hours (annual documentation required) <br />d. Removal of sediment, trash and debris (annual documentation required) <br /> <br /> <br />Cover Sheet and Project Notes <br /> <br />1. Reference the most recent edition (2018) of the City of St. Anthony’s General Specifications and <br />Standard Detail Plates for Street and Utility Construction as a governing specification. <br /> <br /> <br />Preliminary Plat <br /> <br />1. Remove the erroneous line within the 15’ drainage and utility easement along Kenzie Terrace.