My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 02262018
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2018
>
PL PACKET 02262018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 8:40:08 AM
Creation date
2/20/2018 3:22:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 <br />REVISED TRAFFIC STUDY <br />CITY OF SAINT ANTHONY <br />WSB PROJECT NO. 2170-300 PAGE 12 <br /> <br />C. Projected Traffic Volumes <br /> <br />Traffic forecasts were prepared for the year 2019 which is the year after the <br />initial phase the proposed development is anticipated to be completed and for the <br />2030 conditions the Comprehensive Plan year which represents the full <br />development of the area. <br /> <br />The traffic forecasts were prepared by adding the projected annual background <br />traffic growth and the projected non-development traffic growth to the existing <br />2016 traffic counts to determine the “No-Build” traffic conditions. It was <br />determined that with the minimal increase in background traffic the 2019 no- <br />build condition would be similar to the existing 2016 conditions, therefore it was <br />not included in the analysis. <br /> <br />The proposed development traffic was then added to the no-build traffic <br />conditions to determine the 2019 and 2030 Build traffic conditions. As a worst <br />case condition it was assumed that the entire site would be developed for the <br />2019 build condition. Figures 6 - 11 show the projected 2030 no-build, 2019 <br />build and 2030 Build AM and PM peak hour traffic volumes. <br /> <br />During the preparation of the previous Traffic Study concerns were raised with <br />the amount of traffic on adjacent roadways, specifically; Stinson Parkway north and <br />south of Kenzie Terrace (CR 153) and Lowry Avenue west of Stinson Parkway. <br /> <br />Table 4 below shows the summary of the existing and projected traffic volumes. <br /> <br />Table 4 – Traffic Volume Summary <br />Location <br />Existing 2016 2030 No-Build 2030 Build 2040 <br />ADT ADT AM <br />Peak <br />PM <br />Peak ADT AM <br />Peak <br />PM <br />Peak ADT AM <br />Peak <br />PM <br />Peak <br />Stinson Pkwy - <br />South of <br />Kenzie Tr <br />8,000 698 1,053 8,200 716 1,078 9,500 806 1,203 11,500 <br />Stinson Pkwy - <br />North of <br />Kenzie Tr <br />6,000 463 697 6,150 476 734 6,350 534 797 7,250 <br />Lowry Ave - <br />West of <br />Stinson Pkwy <br />7,000 793 1,117 7,150 812 1,142 7,300 820 1,153 8,100 <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.