My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 02262018
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2018
>
PL PACKET 02262018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 8:40:08 AM
Creation date
2/20/2018 3:22:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 <br />REVISED TRAFFIC STUDY <br />CITY OF SAINT ANTHONY <br />WSB PROJECT NO. 2170-300 PAGE 22 <br />• PM Peak Hour <br />o NB left from New Brighton Blvd to St Anthony Blvd – LOS E <br />o NB thru on New Brighton Blvd at St Anthony Blvd – LOS D <br />o SB left from New Brighton Blvd to St Anthony Blvd – LOS E <br />o SB thru on New Brighton Blvd at St Anthony Blvd – LOS D <br />o SE left from St Anthony Blvd to New Brighton Blvd – LOS D <br />o NW left from St Anthony Blvd to New Brighton Blvd – LOS F <br />o NW thru on St Anthony Blvd at New Brighton Blvd – LOS F <br />o NW right from St Anthony Blvd to New Brighton Blvd – LOS E <br /> <br />Table 6: 2030 No Build Condition Level of Service Summary <br />Intersection <br />AM Peak Hour PM Peak Hour <br />LOS <br />Overall <br />Delay <br />(sec/veh) <br />LOS <br />Overall <br />Delay <br />(sec/veh) <br />St Anthony Blvd at Stinson Pkwy A (B) 9.5 C (C) 15.9 <br />St Anthony Blvd at Kenzie Ter B (C) 18.4 B (D) 15.0 <br />St Anthony Blvd at New Brighton Blvd B (D) 17.7 D (F) 45.7 <br />Stinson Blvd at 27th Street A (A) 6.7 A (B) 9.0 <br />Stinson Blvd at 26th Street A (B) 2.9 A (C) 4.7 <br />Stinson Blvd at Lowry Ave/Kenzie Ter B (C) 18.2 D (E) 36.5 <br />Kenzie Ter at Lowry Grove Entrance A (A) 0.6 A (B) 0.8 <br />Kenzie Ter at Wilson Street A (B) 2.7 A (B) 3.0 <br />Kenzie Ter at Autumn Wood/Apt B (C) 13.8 B (C) 14.3 <br />A (A) – Overall LOS (Worst Movement LOS) <br /> <br />Table 7 – Projected Build Level of Service Summary, shows that, similar to the no-build <br />conditions, all intersection and driveways will be operating at an overall LOS C or better in <br />2019 and 2030 during both the weekday AM and PM peak hours with the existing <br />intersection geometrics and traffic control, except the intersection of St Anthony Blvd at <br />New Brighton Blvd which is operating at a LOS D during the PM Peak Hour. All movements <br />are also operating at LOS C or better, however, with the increase in traffic, some <br />movements will be operating at LOS D or worse including the following: <br /> <br />• 2019 <br />o NB left from New Brighton Blvd to St Anthony Blvd, PM – LOS D <br />o NB thru on New Brighton Blvd at St Anthony Blvd, PM – LOS D <br />o SB left from New Brighton Blvd to St Anthony Blvd, PM – LOS E <br />o SB thru on New Brighton Blvd at St Anthony Blvd, PM – LOS D <br />o SE left from St Anthony Blvd to New Brighton Blvd, PM – LOS D <br />o NW left from St Anthony Blvd to New Brighton Blvd, AM - LOS D, PM – LOS E <br />o NW thru on St Anthony Blvd at New Brighton Blvd, PM – LOS E <br />o NW right from St Anthony Blvd to New Brighton Blvd, PM – LOS D
The URL can be used to link to this page
Your browser does not support the video tag.